Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 1 <br />SECTION 1 INTRODUCTION <br />1.1 Purpose <br />The purpose of this study is to evaluate water supply projects that would allow the City of Pleasanton <br />(City) to recover and utilize its 3,500 acre-feet per year (AFY) of Groundwater Production Quota (GPQ). In <br />2022, the City fully shutdown use of Wells 5, 6, and 8 due to the detection of per- and polyfluoroalkyl <br />substances (PFAS). To offset the loss of its GPQ in the interim, the City has increased its purchases of <br />treated water from the Zone 7 Water Agency (Zone 7) at wholesale rates. Long-term, the City’s goal is to <br />determine the most reliable and cost-effective alternative for recovering and utilizing its GPQ. <br />This study evaluates three alternatives for recovering and utilizing its GPQ based on established criteria, <br />weighted scoring, and a cost evaluation (capital and life cycle) to identify the preferred alternative. In <br />addition to water supply changes, all alternatives require specific improvements to the City’s distribution <br />system to convey water to customers. <br />1.2 Introduction <br />The City retained Carollo Engineers (Carollo) to evaluate three water supply alternatives intended to <br />restore the use of the City’s GPQ of 3,500 AFY in January 2026. The three potential groundwater supply <br />alternatives defined by the City are: <br /> Alternative 1 – Continuing to Offset its GPQ with Increased Wholesale Purchases from Zone 7 (Baseline <br />Project). <br /> Alternative 2 – New Joint Groundwater Project between City and Zone 7 (Joint Project). <br /> Alternative 3 – New City Groundwater Project (City Only Project). <br />Each alternative represents a distinct approach to developing and delivering the City’s GPQ, including <br />differences in ownership structure, cost sharing, infrastructure improvements, and operational <br />responsibilities. Distribution system improvements associated with each alternative were identified by Akel <br />Engineering Group, Inc. (Akel) in November 2025 during a hydraulic analysis of the City’s water system. <br />The hydraulic modeling evaluated each groundwater supply configuration and determined the system <br />upgrades necessary to deliver the full GPQ under both annual and maximum day demand conditions now <br />and into the future. <br />This study defines and evaluates the unique components of each alternative using established evaluation <br />criteria and a weighted scoring methodology. The alternatives are further assessed through a life-cycle <br />cost analysis and a cost-benefit framework to recommend a preferred alternative. <br />1.3 Background <br />Zone 7 supplies treated water to multiple agencies in the Tri-Valley, including the City. The City has <br />historically met their potable water demands by purchasing treated water from Zone 7 and utilizing its <br />GPQ through operation of City-owned groundwater wells (Wells 5, 6, and 8). The City’s GPQ historically <br />represents approximately 20 to 30 percent of the City’s total water supply needs. In 2022, the City fully