Laserfiche WebLink
DETAILED COST ESTIMATE <br />Project: Pleasanton GW Supply Alternatives Study Format:MASTER FORMAT 17 <br />Client: City of Pleasanton #####Date :March 30, 2026 <br />Location: Pleasanton, CA By :Susan Fox <br />Element: 01 Turnout Structure Reviewed:Nick Mitchell <br />SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL <br /> Division 02 - Site Construction <br />02000 Site Demo, Finished Site Work and Gradiing 1 LS $165,000.00 $165,000 <br />Total $165,000 <br />Division 03 - Concrete <br />03000 <br />Turnout Precast Concrete Vault with Access <br />Hatch 1 LS $180,000.00 $180,000 <br />Total $180,000 <br />Division 15 - Mechanical <br />15000 18" FLG x FLG DI Spool (6 ft long)2 EA $7,000.00 $14,000 <br />15000 18" FLG x FLG DI Spool (2.5 ft long)1 EA $5,500.00 $5,500 <br />15000 18" V-Port Ball Valve with Electric Motor 1 EA $130,000.00 $130,000 <br />15000 18" Combo Pressure Reducing Check Valve 1 EA $80,000.00 $80,000 <br />15000 18" BFV 2 EA $10,000.00 $20,000 <br />15115 <br />18" 125# D.I. Gate Valve, Fxf Nrs <br />W/H'Wheel Op 1 EA $30,000.00 $30,000 <br />15115 8' C. I. Valve Box For 3"-20" Valves 1 EA $2,500.00 $2,500 <br />15121 18" Dismantling Joint 1 EA $8,000.00 $8,000 <br />Total $290,000 <br />Division 16 - Electrical <br />16000 Electrical System 1 LS $350,000.00 $350,000 <br />Total $350,000 <br />Division 17 - Instrumentation and <br />Controls <br />17302 <br />18" Flow Measurement Magnetic Flow <br />Meter 1 EA $36,000.00 $36,000 <br />Total $36,000 <br />Grand Total $1,021,000 <br />f/n: Turnout No. 8.xlsm-01 Turnout Structure Page 2 of 4 3/30/2026