My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILED COST ESTIMATE <br />Project: Pleasanton GW Supply Alternatives Study Format:MASTER FORMAT 17 <br />Client: City of Pleasanton #####Date :March 30, 2026 <br />Location: Pleasanton, CA By :Susan Fox <br />Element: 02 Pipeline Reviewed:Nick Mitchell <br />SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL <br /> Division 01 - General Conditions <br />01000 Traffic Control 1 LS $25,000.00 $25,000 <br />Total $25,000 <br />Division 02 - Site Construction <br />02000 Trench Shoring 1 LS $25,000.00 $25,000 <br />Total $25,000 <br />Division 15 - Mechanical <br />15000 Zone 7 Connection 1 LS $100,000.00 $100,000 <br />15000 18-inch Ductile Iron Pipeline 150 LF $650.00 $97,500 <br />15000 Connection to Pleasanton Pipeline 1 LS $50,000.00 $50,000 <br />15000 18" 90 deg Elbow 2 EA $6,000.00 $12,000 <br />15000 18x18x18 Tee 2 EA $7,500.00 $15,000 <br />Total $274,500 <br />Grand Total $324,500 <br />f/n: Turnout No. 8.xlsm-02 Pipeline Page 3 of 4 3/30/2026
The URL can be used to link to this page
Your browser does not support the video tag.