Laserfiche WebLink
DETAILED COST ESTIMATE <br />Project: Pleasanton GW Supply Alternatives Study Format:MASTER FORMAT 17 <br />Client: City of Pleasanton #####Date :March 30, 2026 <br />Location: Pleasanton, CA By :Susan Fox <br />Element: 02 Pipeline Reviewed:Nick Mitchell <br />SPEC. NO. DESCRIPTION QUANTITY UNIT UNIT COST SUBTOTAL TOTAL <br /> Division 01 - General Conditions <br />01000 Traffic Control 1 LS $25,000.00 $25,000 <br />Total $25,000 <br />Division 02 - Site Construction <br />02000 Trench Shoring 1 LS $25,000.00 $25,000 <br />Total $25,000 <br />Division 15 - Mechanical <br />15000 Zone 7 Connection 1 LS $100,000.00 $100,000 <br />15000 18-inch Ductile Iron Pipeline 150 LF $650.00 $97,500 <br />15000 Connection to Pleasanton Pipeline 1 LS $50,000.00 $50,000 <br />15000 18" 90 deg Elbow 2 EA $6,000.00 $12,000 <br />15000 18x18x18 Tee 2 EA $7,500.00 $15,000 <br />Total $274,500 <br />Grand Total $324,500 <br />f/n: Turnout No. 8.xlsm-02 Pipeline Page 3 of 4 3/30/2026