Laserfiche WebLink
REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> ES-1 Zone 7 Water Agency <br />December, 2025 <br /> <br />EXECUTIVE SUMMARY <br />Luhdorff & Scalmanini Consulting Engineers (LSCE) has prepared this Regional Groundwater Facilities <br />Project Feasibility Study (Study) on behalf of Zone 7 Water Agency (Zone 7), and in coordination with the <br />City of Pleasanton (City), to evaluate the potential for new groundwater production facilities to provide <br />groundwater supplies to the City and provide drought reliability for Zone 7. The Study addresses the City’s <br />and Zone 7’s combination of overlapping and separate project objectives including providing customers <br />with safe water, addressing long-term water supply reliability challenges, capturing cost savings through <br />economies of scale, continuing management of per- and polyfluoroalkyl substances (PFAS) and total <br />dissolved solids (TDS), and protection of the Livermore Valley Groundwater Basin (Basin) given proximity <br />to known PFAS footprints, and enhancing local drought resilience through additional regional <br />groundwater production capacity. <br />The City originally advanced its own Water Supply Alternatives Study (Brown and Caldwell, 2023) and was <br />preparing to design and construct a two-well groundwater project identified through that process. From <br />the City’s perspective, a primary objective of pursuing local groundwater development was a means of <br />improving long-term water supply reliability, reducing reliance on purchased wholesale water and <br />achieving long-term cost savings relative to Zone 7 wholesale supply rates. <br />In parallel, Zone 7 and the City identified broader complementary regional and local objectives, including <br />improving long-term water supply reliability, enhancing drought resilience, managing basin-wide PFAS <br />and TDS risks, and maximizing the value of new groundwater infrastructure through coordinated planning. <br />Based on these shared interests, the City and Zone 7 jointly evaluated whether a coordinated regional <br />groundwater project could better advance both agencies’ objectives compared to planning and <br />implementation of separate water supply projects. <br />This joint evaluation led to the issuance of Request for Proposals (RFP) #2025-12, selection of LSCE as the <br />lead consultant with technical support from Carollo Engineers, and development of this Feasibility Study. <br />Since project initiation, Zone 7, the City, and the consultant team have conducted multiple workshops and <br />technical meetings with the Zone 7 Board of Directors and City leadership to review hydrogeologic <br />findings, define evaluation criteria, and advance alternatives to a feasibility-level assessment. <br />A central technical driver of the Study remains the presence of PFAS within the Basin, requiring careful <br />siting and design of new production capacity to expand local supplies while avoiding PFAS-impacted zones <br />and protecting long-term basin sustainability. <br />The Study applied a structured evaluation and ranking process that began with an initial screening of <br />potential alternatives and advanced four representative project configurations for detailed evaluation as <br />follows: <br /> Project Alternative #1 – Tennis Park <br /> Project Alternative #2 – Tennis and Hansen Park <br /> Project Alternative #3 – Tennis and Del Prado Park <br /> Project Alternative #4 – Tennis, Hansen, and Del Prado Park