REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 1 Zone 7 Water Agency <br />December, 2025 <br /> <br />1. INTRODUCTION <br />Zone 7 and the City commissioned this Study to evaluate the development of new groundwater <br />production wells in the Bernal Subbasin of the Livermore Valley Groundwater Basin. Zone 7 is the regional <br />water wholesaler and designated Groundwater Sustainability Agency (GSA) for the Basin, responsible for <br />long-term supply reliability, groundwater management, and regulatory compliance. <br />Zone 7 supplies treated and untreated water to multiple retail agencies in the Tri-Valley, which include <br />the Cities of Pleasanton and Livermore, Dublin San Ramon Services District, and California Water Service <br />Company. Zone 7 serves more than 280,000 residents and businesses across a service area of <br />approximately 425 square miles in Alameda and Contra Costa Counties through surface water treatment <br />plants, groundwater wells, and over 40 miles of transmission pipelines. Pleasanton’s potable water <br />demand has historically been met by a combination of Zone 7 treated water purchases and a City <br />groundwater production quota (GPQ) of 3,500 acre-feet per year (AFY). <br />1.1. Background <br />Zone 7 supplies treated drinking water to multiple agencies in the Tri-Valley, including the City. The City’s <br />potable water demands have historically been met by a mix of Zone 7 treated water purchases and <br />City owned groundwater wells (Wells 5, 6, and 8). In 2020, PFAS was detected in these wells and near <br />after were removed from service, increasing the City’s reliance to 100% Zone 7 supplies at the more <br />expensive wholesale rate. To address this immediate loss, the City advanced the PFAS Treatment and <br />Wells Rehabilitation Project (2020–2022), which reached the 50-percent design stage and included well <br />rehabilitation, construction of new wells, and a centralized PFAS treatment facility. In late 2022, the City <br />put the project on hold pending completion of a broader Water Supply Alternatives Study before <br />committing to long-term treatment (Brown and Caldwell, 2024). <br />That study, completed in 2023, identified a project involving construction of two new City wells west of <br />the PFAS footprint as the preferred alternative. While the City was prepared to pursue this independently, <br />Zone 7 and the City recognized that a coordinated regional project could provide broader benefits, <br />including drought resilience, reduced reliance on imported supplies, and cost efficiencies. <br />Zone 7 and the City initiated this Feasibility Study (Study) for the Regional Groundwater Facilities Project <br />as part of Phase I, which includes the exploratory test well program and evaluation of up to three new <br />municipal supply wells in the Bernal Subbasin. The purpose of Phase I is to identify a preferred project <br />alternative capable of providing a minimum of 7,000 AFY of groundwater under drought conditions, of <br />which 3,500 AFY will be allocated to meet the City’s GPQ. LSCE was retained as lead consultant, with <br />Carollo Engineers supporting conceptual project design and cost estimating and associated Phase I design <br />tasks. If Zone 7 and the City decide to proceed with the identified project alternative, the project will then <br />be advanced into Phase II which consists of detailed design of production wells, pipelines, and required <br />HCF upgrades, followed by construction and implementation. <br />Because PFAS, TDS, and other regulated constituents occur in the Bernal Subbasin, the Study included test <br />well drilling, aquifer testing, and water quality sampling to characterize production capacity and assess <br />long-term water quality risks. Any new groundwater supplies developed as part of this project will be <br />integrated into Zone 7’s HCF, which uses chloramines for disinfection prior to being combined with <br />separate treated surface water sources in the distribution system. Delivery of the City's GPQ would be via <br />the Zone 7 water supply system (as opposed to the City current configuration of direct delivery from <br />dedicated City wells). Separate from this Study, the City is evaluating needed improvements to their <br />distribution system to receive the water in this fashion. An overall project site map is shown in Figure 1.