Laserfiche WebLink
REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 11 Zone 7 Water Agency <br />December, 2025 <br /> <br /> Preferred pipeline alignments and potential integration with new/replacement/existing <br />facilities. <br /> Test well water quality and treatment considerations for each well location. <br /> Site-specific constraints and potential community impacts for each park setting. <br /> <br />Alternatives that could not meet the production objectives were eliminated (e.g., a Del Prado-only <br />project). A Hansen-only project was also dismissed, as it offered no clear production advantage compared <br />with a Tennis-only project and carries greater community impact potential due to proximity to residential <br />areas. Following similar screening measures, four representative alternatives were advanced for detailed <br />evaluation, ranging from a single-well project to a three-well configuration: <br /> Alternative 1 – Tennis Park <br /> Alternative 2 – Tennis and Hansen Park <br /> Alternative 3 – Tennis and Del Prado Park <br /> Alternative 4 – Tennis, Hansen, and Del Prado Park <br />3.2. Project Alternatives <br />Each of the four project alternatives involves construction of either one, two, or three new production <br />wells at the City-owned park sites evaluated in this Study. The sites were selected for their proximity to <br />the HCF, sufficient land area for facility development, and locations outside the known PFAS footprint. <br />Site visits with Zone 7 and City staff were used to identify potential permanent well locations and assess <br />park impacts, and define other collective project goals. <br />At the feasibility level, the final production well and pump station locations within Tennis Park and Hansen <br />Park have not yet been finalized. Final site selection will occur during the initial design phase and will be <br />developed in coordination with City Planning, Parks, and Recreation staff, with public outreach conducted <br />as appropriate. Site selection will consider factors including routine and special operations and <br />maintenance access such as access for portable generators, equipment removal, and crane operations, <br />availability and routing of PG&E electrical service, storm drain capacity for blowoff and testing discharges, <br />and compliance with applicable noise ordinances. The proposed siting concepts for the Tennis Park and <br />Hansen Park locations are illustrated in the BODR (see Appendix J). Figures included in this section are <br />provided for conceptual planning purposes only and are intended to illustrate the general relationship of <br />well facilities to each park and the HCF, not to depict final or precise facility locations within the parks. <br />Under all project alternatives evaluated in this Study, integration of new groundwater production capacity <br />will require substantial modification and expansion of the existing HCF as the existing HCF configuration <br />does not have sufficient operational capabilities to accommodate the proposed raw water conveyance, <br />flow ranges, and operational requirements associated with the new production wells. As a result, <br />implementation of any project alternative would involve reconfiguration of the HCF to support updated <br />chloramination, hydraulics, controls, and operational flexibility consistent with project objectives. <br />3.2.1. Alternative 1 – Tennis Park Well <br />Tennis Park is located at the corner of Valley Avenue and Hopyard Road and is the closest of the candidate