Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-82 <br /> <br /> <br />4.13.1. Discussion <br />4.13.1.1. Impact REC-1 <br />Initial treatment and treatment maintenance activities would take place on land in and adjacent to the <br />City and unincorporated Alameda County. Some portions of the project area are designated by the <br />relevant jurisdictions as open space and/or parks and recreation space. Access to some treatment areas <br />would rely on unpaved roads, which are sometimes used as recreational trails. The potential for treatment <br />activities to directly or indirectly disrupt recreational activities within designated recreation areas was <br />evaluated in the PEIR and found to be less than significant. The potential for vegetation treatment and <br />maintenance activities (including prescribed fire) to cause a significant environmental impact is within the <br />scope of the PEIR because the treatment types and activities are consistent with those evaluated in the <br />PEIR. SPR AD-3 is applicable to the proposed project, and it requires proposed project treatments to be <br />consistent with local plans, policies, and ordinances relevant to recreation, which include general plans, <br />zoning ordinances, and adopted policies to avoid conflicts with recreational uses. SPR REC-1 is applicable <br />to the proposed project, and it requires the project proponent to coordinate with the owner/manager of <br />any recreation area or facility that would be temporarily closed during treatment activity, including posting <br />notifications at least 2 weeks prior to the commencement of the treatment activities. The potential for the <br />proposed treatment project to impact recreation is within the scope of the PEIR and would be less than <br />significant because the treatment activities and intensity are consistent with those analyzed in the PEIR. <br />The inclusion of land that is outside the CalVTP treatable landscape in the proposed treatment area (92.5 <br />acres) constitutes a change to the geographic extent presented in the PEIR. However, the availability of <br />recreational resources within the project area is essentially the same as outside the treatable landscape <br />because the areas are near to each other and the recreational users would be the same. Impacts to <br />recreation would be the same as previously described and would be less than significant. Implementation <br />of SPRs AD-3 and REC-1 would minimize disruption to recreational activities within the project area. This <br />determination is consistent with the PEIR and would not constitute a substantially more severe significant <br />impact than covered in the PEIR. <br />4.13.1.2. New Recreation Impacts <br />The proposed project is consistent with the treatment types and activities considered in the CalVTP PEIR. <br />The site-specific characteristics of the proposed treatments are consistent with the applicable <br />environmental and regulatory conditions presented in the CalVTP PEIR (refer to Sections 3.14.1, <br />Environmental Setting, and 3.14.2, Regulatory Setting, in Volume II of the Final PEIR). <br />The inclusion of land that is outside the treatable landscape in the proposed treatment area (92.5 acres) <br />constitutes a change to the geographic extent presented in the PEIR. However, within the boundary of the