Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-21 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />specified in the above bullets may be implemented on a site-specific <br />basis if the qualified RPF and the project proponent demonstrate <br />through substantial evidence that alternative design measures provide a <br />more effective means of achieving the treatment goals objectives and <br />would result in effects to the Beneficial Functions of Riparian Zones <br />equal or more favorable than those expected to result from application <br />of the above measures <br />o Deviation from the above design specifications, different <br />protection measures, and design standards would only be <br />approved when the treatment plan incorporates an evaluation <br />of beneficial functions of the riparian habitat and with written <br />concurrence from CDFW <br />This SPR applies to all treatment activities and treatment types, including <br />treatment maintenance.