My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-36 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />• Retention of Raptor Nest Trees: Trees with visible raptor nests, whether <br />occupied or not, would be retained <br />This SPR applies to all treatment activities and treatment types, including <br />treatment maintenance. <br />Geology, Soils, and Mineral Resource Standard Project Requirements <br />SPR GEO-1 Suspend Disturbance during Heavy Precipitation <br />The project proponent would suspend mechanical, prescribed herbivory, and <br />herbicide treatments if the National Weather Service forecast is a “chance” (30 <br />percent or more) of rain within the next 24 hours. Activities that cause <br />mechanical soil disturbance may resume when precipitation stops and soils are <br />no longer saturated (i.e., when soil and/or surface material pore spaces are filled <br />with water to such an extent that runoff is likely to occur). Indicators of saturated <br />soil conditions may include, but are not limited to: (1) areas of ponded water, (2) <br />pumping of fines from the soil or road surfacing, (3) loss of bearing strength <br />resulting in the deflection of soil or road surfaces under a load, such as the <br />creation of wheel ruts, (4) spinning or churning of wheels or tracks that produces <br />a wet slurry, or (5) inadequate traction without blading wet soil or surfacing <br />materials. This SPR applies only to mechanical, prescribed herbivory, and <br />herbicide treatment activities and all treatment types, including treatment <br />maintenance. <br />Project-Specific Measures <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton
The URL can be used to link to this page
Your browser does not support the video tag.