My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-39 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />The project proponent would drain compacted and/or bare linear treatment <br />areas capable of generating storm runoff via water breaks using the spacing and <br />erosion control guidelines contained in Sections 914.6, 934.6, and 954.6(c) of the <br />California Forest Practice Rules (CAL FIRE 2019). Where waterbreaks cannot <br />effectively disperse surface runoff, including where waterbreaks cause surface <br />run-off to be concentrated on downslopes, other erosion controls would be <br />installed as needed to maintain site productivity by minimizing soil loss. This SPR <br />applies only to mechanical, manual, and prescribed burn treatment activities and <br />all treatment types, including treatment maintenance. <br />Treatment <br />Maintenance: <br />Y <br />SPR GEO-6 Minimize Burn Pile Size <br />The project proponent would not create burn piles that exceed 20 feet in length, <br />width, or diameter, except when on landings, road surfaces, or on contour to <br />minimize the spatial extent of soil damage. In addition, burn piles would not <br />occupy more than 15 percent of the total treatment area (Busse, Hubbert, and <br />Moghaddas 2014). The project proponent would not locate burn piles in a <br />Watercourse and Lake Protection Zone as defined in SPR HYD-4. This SPR applies <br />to mechanical, manual, and prescribed burning treatment activities and all <br />treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />SPR GEO-7 Minimize Erosion <br />To minimize erosion, the project proponent would: <br />1. Prohibit use of heavy equipment where any of the following conditions <br />are present: <br />a. Slopes steeper than 65 percent <br />b. Slopes steeper than 50 percent where the erosion hazard rating <br />is high or extreme <br />c. Slopes steeper than 50 percent that lead without flattening to <br />sufficiently dissipate water flow and trap sediment before it <br />reaches a watercourse or lake <br />2. On slopes between 50 percent and 65 percent where the erosion hazard <br />rating is moderate and all slope percentages are for average slope <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton
The URL can be used to link to this page
Your browser does not support the video tag.