My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-51 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />SPR HYD-6 Protect Existing Drainage Systems <br />If a treatment activity is adjacent to a roadway with stormwater drainage <br />infrastructure, the existing stormwater drainage infrastructure would be marked <br />prior to ground disturbing activities. If a drainage structure or infiltration system <br />is inadvertently disturbed or modified during project activities, the project <br />proponent would coordinate with owner of the system or feature to repair any <br />damage and restore pre-project drainage conditions. This SPR applies to all <br />treatment activities and treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />Prior and during The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />Noise Standard Project Requirements <br />SPR NOI-1 Limit Heavy Equipment Use to Daytime Hours <br />The project proponent would require that operation of heavy equipment <br />associated with treatment activities (heavy off-road equipment, tools, and <br />delivery of equipment and materials) would occur during daytime hours if such <br />noise would be audible to receptors (e.g., residential land uses, schools, <br />hospitals, places of worship). Cities and counties in the treatable landscape <br />typically restrict construction-noise (which would apply to vegetation treatment <br />noise) to particular daytime hours. If the project proponent is subject to local <br />noise ordinance, it would adhere to those to the extent the project is subject to <br />them. If the applicable jurisdiction does not have a noise ordinance or policy <br />restricting the time of day when noise-generating activity can occur, noise- <br />generating vegetation treatment activity would be limited to the hours of 7:00 <br />a.m. to 6:00 p.m., Monday through Saturday, and between 9:00 a.m. and 6:00 <br />p.m. on Sunday and federal holidays. If the project proponent is not subject to <br />local ordinances (e.g., CAL FIRE), it would adhere to the restrictions stated above <br />or may elect to adhere to the restrictions identified by the local ordinance <br />encompassing the treatment area. This SPR applies to all treatment activities and <br />treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />SPR NOI-2 Equipment Maintenance Initial <br />Treatment: Y Prior and during The City of <br />Pleasanton <br />The City of <br />Pleasanton
The URL can be used to link to this page
Your browser does not support the video tag.