Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-52 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />The project proponent would require that all powered treatment equipment and <br />power tools would be used and maintained according to manufacturer <br />specifications. All diesel- and gasoline-powered treatment equipment would be <br />properly maintained and equipped with noise-reduction intake and exhaust <br />mufflers and engine shrouds, in accordance with manufacturers’ <br />recommendations. This SPR applies to all activities and all treatment types, <br />including treatment maintenance. <br />Treatment <br />Maintenance: <br />Y <br />SPR NOI-3 Engine Shroud Closure <br />The project proponent would require that engine shrouds be closed during <br />equipment operation. This SPR applies only to mechanical treatment activities <br />and all treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />SPR NOI-4 Locate Staging Areas Away from Noise-Sensitive Land Uses <br />The project proponent would locate treatment activities, equipment, and <br />equipment staging areas away from nearby noise-sensitive land uses (e.g., <br />residential land uses, schools, hospitals, places of worship), to the extent feasible, <br />to minimize noise exposure. This SPR applies to all treatment activities and <br />treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />Prior and during The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />SPR NOI-5 Restrict Equipment Idle Time <br />The project proponent would require that all motorized equipment be shut down <br />when not in use. Idling of equipment and haul trucks would be limited to 5 <br />minutes. This SPR applies to all treatment activities and all treatment types, <br />including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />During The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />SPR NOI-6 Notify Nearby Off-Site Noise-Sensitive Receptors <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />Prior The City of <br />Pleasanton <br />The City of <br />Pleasanton