My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-98 <br /> <br /> <br />MITIGATION MEASURES APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />o Restoring sensitive natural community or oak woodland functions and <br />acreage within the treatment area <br />o Restoring degraded sensitive natural communities or oak woodlands <br />outside of the treatment area at a sufficient ratio to offset the loss of <br />acreage and habitat function; or <br />o Preserving existing sensitive natural communities or oak woodlands of <br />equal or better value to the sensitive natural community lost through a <br />conservation easement at a sufficient ratio to offset the loss of acreage <br />and habitat function <br />• The project proponent would prepare a Compensatory Mitigation Plan that <br />identifies the residual significant effects on sensitive natural communities or oak <br />woodlands that require compensatory mitigation and describes the <br />compensatory mitigation strategy being implemented to reduce residual effects, <br />and: <br />o For preserving existing habitat outside of the treatment area in <br />perpetuity, the Compensatory Mitigation Plan would include a summary <br />of the proposed compensation lands (e.g., the number and type of <br />credits, location of mitigation bank or easement), parties responsible for <br />the long-term management of the land, and the legal and funding <br />mechanism for long-term conservation (e.g., holder of conservation <br />easement or fee title) <br />▪ The project proponent would submit evidence that the <br />necessary mitigation has been implemented or that the project <br />proponent has entered into a legal agreement to implement it <br />and that compensatory habitat would be preserved in <br />perpetuity <br />o For restoring or enhancing habitat within the treatment area or outside <br />of the treatment area, the Compensatory Mitigation Plan would include <br />a description of the proposed habitat improvements, success criteria <br />that demonstrate the performance standard of maintained habitat <br />function has been met, legal and funding mechanisms, and parties
The URL can be used to link to this page
Your browser does not support the video tag.