Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-99 <br /> <br /> <br />MITIGATION MEASURES APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />responsible for long-term management and monitoring of the restored <br />or enhanced habitat <br />The project proponent would consult with CDFW and/or any other applicable responsible <br />agency prior to finalizing the Compensatory Mitigation Plan in order to satisfy that <br />responsible agency’s requirements (e.g., permits, approvals) within the plan. <br />MM BIO-3c: Compensate for Unavoidable Loss of Riparian Habitat <br />If, after implementation of SPR BIO-4, impacts to riparian habitat remain significant under <br />CEQA, the project proponent would implement the following: <br />• Compensate for unavoidable losses of riparian habitat acreage and function by: <br />o Restoring riparian habitat functions and acreage within the treatment <br />area <br />o Restoring degraded riparian habitat outside of the treatment area; <br />o Purchasing riparian habitat credits at a CDFW-approved mitigation bank; <br />or <br />o Preserving existing riparian habitat of equal or better value to the <br />riparian habitat lost through a conservation easement at a sufficient <br />ratio to offset the loss of riparian habitat function and value <br />• The project proponent would prepare a Compensatory Mitigation Plan that <br />identifies the residual significant effects on riparian habitat that require <br />compensatory mitigation and describes the compensatory mitigation strategy <br />being implemented to reduce residual effects, and: <br />o For preserving existing riparian habitat outside of the treatment area in <br />perpetuity, the Compensatory Mitigation Plan would include a summary <br />of the proposed compensation lands (e.g., the number and type of <br />credits, location of mitigation bank or easement), parties responsible for <br />the long-term management of the land, and the legal and funding <br />mechanism for long-term conservation (e.g., holder of conservation <br />easement or fee title) <br />▪ The project proponent would submit evidence that the <br />necessary mitigation has been implemented or that the project <br />proponent has entered into a legal agreement to implement it <br />Initial <br />Treatment: N <br />Treatment <br />Maintenance: <br />N <br />N/A N/A N/A