My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />2-14 <br /> <br /> <br />habitat, or presence of sensitive resources. Refueling of equipment would occur outside these buffers and <br />would be performed using containment to mitigate the risk of spills. <br />2.4. General <br />2.4.1. Timing of Initial Treatment <br />The City would commence initial fuel treatment within the project footprint in April 2026 and would <br />complete the work by the end of 2029. <br />2.4.2. Workers <br />The City and/or subcontractors would conduct all treatment activities. Crew team sizes would vary and <br />would typically be fewer than 25 workers per site, per day. Multiple teams would work at the same time. <br />2.4.3. Site Access <br />Treatment areas would be accessed via existing fire roads and trails. No new roads or access points would <br />be created. The Augustin Bernal Community Park parking lot would be used as the primary access point. <br />Vehicles and equipment would be staged at the contractor’s yard daily or on-site in the park, in <br />coordination with the City. <br />2.4.4. Treatment Schedule and Duration <br />Treatments except herbivory would occur primarily on weekdays during daylight hours only. Prescribed <br />burning will also be limited to the months of November 1 to March 31 during the winter hibernation <br />season for Alameda whipsnake as described in Section 2.2.1 During prescribed burning, crews would need <br />to conduct some maintenance burning on weekends to manage overall smoke impacts. Noise-generating <br />treatments would comply with local regulations. <br />2.5. Pests, Diseases, and Invasive Species <br />Without proper prevention, project treatments have potential to spread pathogens, diseases, pests, or <br />invasive species. SOD, pitch canker (Fusarium circinatum), yellow starthistle (Centaurea solstitialis), French <br />broom (Genista monspessulana), stinkwort (Dittrichia graveolens), and snake fungal disease <br />(Ophidiomyces ophiodiicola) occur in the region and have potential to spread in the project area from one <br />work area to another or from the project area to off-site areas. The goal of reducing invasive plant species <br />within the project area is in conformity with the overall project goals of fuels reduction and wildfire
The URL can be used to link to this page
Your browser does not support the video tag.