Laserfiche WebLink
(w) "shot clock" means the presumptively reasonable time defined by the FCC, or <br /> time specified under state law, if applicable, in which a state or local government <br /> must act on an application or request for authorization to place, construct or <br /> modify personal wireless service facilities. <br /> (x) "site" means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(6), which <br /> provides that "[f]or towers other than towers in the public rights-of-way, the current <br /> boundaries of the leased or owned property surrounding the tower and any access <br /> or utility easements currently related to the site, and, for other eligible support <br /> structures, further restricted to that area in proximity to the structure and to other <br /> transmission equipment already deployed on the ground. The current boundaries <br /> of a site are the boundaries that existed as of the date that the original support <br /> structure or a modification to that structure was last reviewed and approved by a <br /> State or local government, if the approval of the modification occurred prior to the <br /> Spectrum Act or otherwise outside of the Section 6409(a) process." <br /> (y) "substantial change" or "substantially change" means the same as defined by <br /> the FCC in 47 C.F.R. § 1.6100(b)(7), which defines that term differently based on <br /> the particular facility type and location. For clarity, the definition in this policy <br /> organizes the FCC's criteria and thresholds for a substantial change according to <br /> the facility type and location. <br /> (1) For towers outside the public rights-of-way, a substantial change occurs when: <br /> (A) the proposed collocation or modification increases the overall height more <br /> than 10% or the height of one additional antenna array with separation from <br /> the nearest antenna not to exceed 20 feet (whichever is greater); or <br /> (B) the proposed collocation or modification increases the width more than 20 <br /> feet from the edge of the wireless tower or the width of the wireless tower <br /> at the level of the appurtenance (whichever is greater); or <br /> (C) the proposed collocation or modification involves the installation of more <br /> than the standard number of equipment cabinets for the technology <br /> involved, not to exceed four; or <br /> (D) the proposed collocation or modification involves excavation or deployment <br /> outside the current boundaries of the leased or owned property surrounding <br /> the wireless tower by more than 30 feet in any direction. The site boundary <br /> from which the 30 feet is measured excludes any access or utility <br /> easements currently related to the site. <br /> (2) For towers in the public rights-of-way and for all base stations, a substantial <br /> change occurs when: <br /> Eligible Facilities Requests Policy (City of Pleasanton) page 7/26 <br />