Laserfiche WebLink
(A) the proposed collocation or modification increases the overall height more <br /> than 10% or 10 feet (whichever is greater); or <br /> (B) the proposed collocation or modification increases the width more than 6 <br /> feet from the edge of the wireless tower or base station; or <br /> (C) the proposed collocation or modification involves the installation of any new <br /> equipment cabinets on the ground when there are no existing ground- <br /> mounted equipment cabinets; or <br /> (D) the proposed collocation or modification involves the installation of any new <br /> ground-mounted equipment cabinets that are ten percent (10%) larger in <br /> height or volume than any existing ground-mounted equipment cabinets; or <br /> (E) the proposed collocation or modification involves excavation or deployment <br /> outside the area in proximity to the structure and other transmission <br /> equipment already deployed on the ground. <br /> (3) In addition, for all towers and base stations wherever located, a substantial <br /> change occurs when: <br /> (A) the proposed collocation or modification would defeat the existing <br /> concealment elements of the support structure as determined by the <br /> Director; or <br /> (B) the proposed collocation or modification violates a prior condition of <br /> approval, provided however that the collocation need not comply with any <br /> prior condition of approval related to height, width, equipment cabinets or <br /> excavation that is inconsistent with the thresholds for a substantial change <br /> described in this section. <br /> Note: The thresholds for a substantial change outlined above are disjunctive. The <br /> failure to meet any one or more of the applicable thresholds means that a <br /> substantial change would occur. The thresholds for height increases are <br /> cumulative limits. For sites with horizontally separated deployments, the <br /> cumulative limit is measured from the originally-permitted support structure without <br /> regard to any increases in size due to wireless equipment not included in the <br /> original design. For sites with vertically separated deployments, the cumulative <br /> limit is measured from the permitted site dimensions as they existed on February <br /> 22, 2012—the date that Congress passed Section 6409(a). <br /> (z) "tower" means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(9), which <br /> defines that term as "[a]ny structure built for the sole or primary purpose of <br /> supporting any FCC-licensed or authorized antennas and their associated <br /> facilities, including structures that are constructed for wireless communications <br /> services including, but not limited to, private, broadcast, and public safety services, <br /> Eligible Facilities Requests Policy(City of Pleasanton) page 8/26 <br />