Laserfiche WebLink
<br /> Definitions. The definitions contained in this article shall govern the construction of this <br />Ordinance unless required otherwise by context. <br /> 1. "District" means the Alameda County Flood Control and Water Conservation District. <br /> 2. "Board" means the Board of Supervisors of Alameda County Flood Control and Water <br />Conservation District. <br /> 3. "Zone" means the Zone No. 7 of the Alameda County Flood Control and Water <br />Conservation District. <br /> 4. "Zone Board" means the Board of Directors of Zone No. 7 of Alameda County Flood <br />Control and Water Conservation District. <br /> 5. "Water supply system" means any combination of facilities that is capable of <br />furnishing treated water service. <br /> 6. "New connection" means any new metered water service that will furnish water from a <br />water supply system that is directly connected to the Zone No. 7 water supply system, including but <br />not limited to water services that are part of any new development to be constructed. <br /> 7. "New development" means any improvement, building or buildings constructed <br />subsequent to the effective date of this Ordinance. <br />(Amended by Ord. FC O-91-68) <br /> <br />SECTION III <br /> <br /> Water Service Connection Charge Schedule. A basic charge of $830.00 shall be multiplied <br />by the fee factor indicated in the following schedule for each new connection to the water supply <br />system subject to this Ordinance. <br /> <br /> Meter Size <br /> Fee Factor <br /> 5/8" 1.0 <br /> 3/4" 1.5 <br /> 1" (See Section VI. 1 below) 2.5 <br /> 1-1/2" 5.0 <br /> 2" 8.0 <br /> <br /> The determination of fee factors is based upon the recommended maximum rate for <br />continuous operations in accordance with the American Water Works Association Standard C700-90 <br />Page 16 of 846