Laserfiche WebLink
for Cold Water Meters-Displacement Type, Bronze Main Case. Fee factors for meters of special <br />capacities and sizes other than those indicated in the above schedule shall be determined by the Zone. <br />The administrative method for setting fee factors for meters of special capacities and sizes in effect on <br />July 17, 1991, shall remain in effect through June 30, 1992. On July 1, 1992, new fee factors for <br />meters of special capacities and sizes using a method that utilizes the recommended maximum rate for <br />continuous operations shall go into effect. <br /> For increasing the meter size or capacity on any existing connection, a charge shall be <br />imposed equal to the product of the basic charge in effect at the time the meter exchange is requested <br />and the difference in the fee factor between the new meter and the existing meter. <br /> There shall be no refund of charges paid for decreasing the meter size or capacity. <br />(Amended by Ord. FC 0-91-68) <br /> <br />SECTION IV <br /> <br /> Dispositon of Charges. All charges collected under the provision of this Ordinance, and a <br />portion of water sales revenues as deemed appropriate by the Zone Board, shall be deposited with the <br />Treasurer of the District, said funds to be designated "Zone 7 Water Facilities Fund." Said funds shall <br />be utilized for the accomplishment of proposed improvements to the Zone No. 7 water supply system, <br />and shall be expended for administration, land acquisition, construction, engineering, repair, <br />maintenance and operation, or reimbursement or retirement of bonded indebtedness incurred for same, <br />in whole or in part, of the water supply facilities within Zone No. 7. Provided, however, that said <br />funds shall not be utilized for the retirement of bonded indebtedness on Zone No. 7 projects incurred <br />prior to January 18, 1972. <br />(Amended by Ord. FC 77-2) <br /> <br />SECTION V <br /> <br /> Collection of Charges. Charges provided for herein shall be collected by the Zone, or the <br />appropriate City Building Official if the improvement is located within an incorporated city, prior to <br />the issuance of a building permit or a use permit for such improvement. In cases where permits are not <br />required, payment of charges shall be made to the Zone or appropriate City Building Official prior to <br />installation of a new connection. Collection by the appropriate City Building Official shall be <br />Page 17 of 846