My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 4-21-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 4-21-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 5:04:41 PM
Creation date
4/28/2026 4:58:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
846
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Confined Space & Elevated Work <br />• Confined space awareness and entry procedures where applicable <br />• Ladder safety, lift safety, and fall protection training <br />• Safe access and egress procedures for work above ceilings and in mechanical or electrical rooms <br /> <br />Fire & Building Occupant Safety <br />• Procedures to prevent false alarms and unintentional system activation <br />• Coordination protocols with City staff prior to system testing or impairment <br />• Measures to ensure continuity of fire protection during maintenance and repair activities <br /> <br />Personal Protective Equipment (PPE) <br />• Identification and use of appropriate PPE for all work activities <br />• Training on PPE selection, inspection, and maintenance <br /> <br />Worksite Conduct & Public Facility Safety <br />• Safe work practices in occupied facilities, including Police Department and other secure <br />locations <br />• Housekeeping standards to prevent trip hazards and maintain clear egress paths <br />• Traffic and pedestrian safety controls when work occurs near public access areas <br /> <br />The Contractor shall maintain all safety training records and make them available to the City upon <br />request. No work shall begin until the City has received and accepted the Contractor’s safety training <br />documentation. The Contractor shall ensure all employees and subcontractors performing work under <br />this Agreement are properly trained and will remain in compliance with safety requirements for the <br />duration of the contract. <br />Failure to comply with safety requirements may result in suspension of work, corrective action, or <br />termination of the Agreement. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 291 of 846
The URL can be used to link to this page
Your browser does not support the video tag.