My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL WORKSHOP SUPPLEMENTAL 3-17-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
031726 WORKSHOP
>
CITY COUNCIL WORKSHOP SUPPLEMENTAL 3-17-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 3:43:24 PM
Creation date
4/29/2026 3:43:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/17/2026
DESTRUCT DATE
15Y
DOCUMENT NO
SUPPLEMENTAL MATERIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 of 12 <br /> <br />Staff compiled data on downtown commercial vacancy rates in Pleasanton, Livermore, Danville <br />and Walnut Creek. Pleasanton’s vacancy rate stands at 8.6%, compared to 10.0% in Walnut <br />Creek, 4.7% in Danville, and 5.5% in Livermore. Vacancy rates currently exceed historic <br />averages across all four downtowns, indicating a challenging market in the region as a whole; <br />although Pleasanton’s rate (+2.51%) above its 10-year average is higher than both Danville and <br />Livermore (+1.46% and +1.54%, respectively). The reasons for this difference are not clear but <br />may include Pleasanton’s prevalence of older or historic buildings, which can be challenging to <br />lease, as a proportion of the total inventory; smaller downtown size (creating less overall activity <br />to support business); or other challenges. Regardless of the reasons, a focus on leasing and <br />tenanting vacant downtown spaces is a priority. <br /> <br />Staff continues to provide the opportunity for prospective tenants and building owners to meet <br />with City staff, and to convene staff from Economic Development, Planning, Building and other <br />Divisions to provide early input on proposals, advise on process, and identify potential project <br />stumbling blocks. The Economic Development team’s 2026 work plan priorities include enhanced <br />collaboration with PDA, downtown landlords and leasing agents to connect prospective tenants <br />with vacant spaces and provide support through City planning and building processes. With the <br />Economic Development Division now fully staffed, the City is increasing efforts to publicize and <br />market these services and ensure Downtown is part of the City’s broader business attraction and <br />retention efforts. <br /> <br />2. Downtown Specific Plan and Policy Updates <br />Several ideas have come forward about potential revisions or updates to the Downtown Specific <br />Plan (DSP) and other policy documents to encourage downtown investment. A particular concern <br />has been raised that the DSP update in 2019 introduced overly restrictive standards for ground <br />floor active uses, and that these standards should be relaxed. There has also been interest in <br />creating a more conducive environment or streamlining/easing permitting requirements for <br />businesses operating later at night, through a right-to-do business ordinance or amendment of <br />the existing Hospitality Guidelines. <br /> <br />A recent staff review of the City’s mixed-use development standards, which apply to properties <br />downtown, has similarly noted that some of the DSP’s standards may be overly restrictive and/or <br />discourage investment or redevelopment of sites. For example, DSP policies that require one-for- <br />one replacement of commercial square footage may make some mixed-use development <br />projects infeasible. Policies that discourage three-story buildings are likely to make most <br />townhome development challenging to build, since constrained downtown sites and standard <br />designs typically demand two stories of living space over parking. <br /> <br />While it would require investment of resources to update the DSP, staff believes there may be <br />merit in making some focused amendments to the Plan, to address the above areas, as well as <br />to potentially re-look at / update the policies around redevelopment of the Civic Center to reflect <br />more recent thinking about this site. <br /> <br />Assuming focused amendments, with some limited consultant support around the California <br />Environmental Quality Act (CEQA) and design standards, staff estimates a DSP update could be <br />completed within 12 months, for approximately $150,000. Funding has not been identified for this <br />project at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.