My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-15 EKI Environment & Water, Inc. <br />7.5 Drought Risk Assessment <br /> <br />In addition to the long-term water service reliability assessment presented above, the DRA evaluates <br />Pleasanton’s supply risks under a severe drought period lasting for the next five consecutive years after <br />the assessment is completed (i.e., 2026-2030). The DRA is intended to inform the DMMs and water supply <br />projects and programs to be included in the UWMP (Section 9). Suppliers may conduct an interim update <br />or updates to this DRA within the five-year cycle of its UWMP update (i.e., before the 2030 UWMP). <br />7.5.1 Data, Methods, and Basis for Water Shortage Condition <br />Similar to the reliability analysis described in Section 7.2, Pleasanton’s DRA is based on Zone 7’s DRA due <br />to Pleasanton’s reliance on water purchases from Zone 7. <br />As presented in Section 7 of Zone 7’s 2025 UWMP, the DRA assumes 30%, 10%, 41%, 6%, and 6% Table A <br />allocations for 2026-2030, respectively. Data for 2026 reflects projected water year supply availability <br />based on currently available data. Data for 2027-2030 reflect the last four years of the multiple-dry year <br />scenario previously discussed (1988-1991). Zone 7’s supply projections are based on existing facilities and <br />the expected availability of supplies from various sources given the constraints previously described. A <br />five-year modeling analysis using 2025 conditions as the initial baseline was conducted. This approach <br />accounts for differences in demand levels and the availability and timing of supply sources during the <br />2026-2030 planning period. <br />7.5.2 Drought Risk Assessment Individual Water Source Reliability <br />Table 7-7 summarizes Zone 7’s available supplies for each year of the DRA. In addition to potable water <br />supplies from Zone 7, the City is expected to produce 3,500 AFY of groundwater in each year of the <br />drought. For the DRA, recycled water supplies are assumed to be sufficient to meet recycled water <br />demands. <br /> CWC §10635(b) <br />Every urban water supplier shall include, as part of its urban water management plan, a drought risk assessment <br />for its water service to its customers as part of information considered in developing the demand management <br />measures and water supply projects and programs to be included in the urban water management plan. The <br />urban water supplier may conduct an interim update or updates to this drought risk assessment within the five- <br />year cycle of its urban water management plan update. The drought risk assessment shall include each of the <br />following: <br />(1) A description of the data, methodology, and basis for one or more supply shortage conditions that are <br />necessary to conduct a drought risk assessment for a drought period that lasts five consecutive water years, <br />starting from the year following when the assessment is conducted. <br />(2) A determination of the reliability of each source of supply under a variety of water shortage conditions. This <br />may include a determination that a particular source of water supply is fully reliable under most, if not all, <br />conditions. <br />(3) A comparison of the total water supply sources available to the water supplier with the total projected water <br />use for the drought period. <br />(4) Considerations of the historical drought hydrology, plausible changes on projected supplies and demands <br />under climate change conditions, anticipated regulatory changes, and other locally applicable criteria.
The URL can be used to link to this page
Your browser does not support the video tag.