Laserfiche WebLink
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-14 EKI Environment & Water, Inc. <br />7.4 Water Supply Management Tools and Options <br /> <br />Pleasanton and Zone 7 coordinate to increase regional supply reliability and reduce reliance on water <br />imports. Pleasanton focuses on demand reduction, specifically prioritizing water conservation and <br />encouraging recycled water use. Zone 7 promotes regional supply reliability and reduced reliance on <br />water imports by: <br />• Pursuing new water supply projects such as the COLCS and Sites Reservoir, which will reduce <br />the need for imported water purchases during dry years; <br />• Evaluating and pursuing new water supply options, including right-sizing water supply and <br />storage options and studying the potential for potable reuse as a water supply; <br />• Supporting the continued use of recycled water for irrigation; <br />• Working closely with its retailers to implement an active conservation program; and <br />• Optimizing and expanding local storage, such as the COLCS. <br />As part of its existing CIP, Zone 7 is planning to invest in a diverse set of projects to support long-term <br />water supply reliability. Zone 7’s CIP includes a regional wells project to expand the groundwater <br />production system, investment in Sites Reservoir, and investment in local storage via the COLCS project, <br />and continued study of the potential for potable reuse in the region. <br />In addition, Zone 7 is a member of the Bay Area Regional Reliability (BARR) partnership, which brings <br />together eight Bay Area water agencies to improve regional water supply reliability. In addition to Zone 7, <br />these agencies include: ACWD, EBMUD, SFPUC, Bay Area Water Supply and Conservation Agency, Contra <br />Costa Water District, Marin Municipal Water District, and Valley Water. The BARR partners have agreed <br />to work cooperatively to address water supply reliability concerns and drought preparedness on a <br />mutually beneficial and regionally focused basis. Near- and long-term joint water supply reliability projects <br />may be evaluated through BARR, such as use of the capacity of existing facilities, changes to infrastructure <br />(including new interties, recycled water, water conservation, expanded treatment, regional desalination, <br />and water transfers and exchanges), and other projects or institutional arrangements that encourage a <br />regional approach to achieving water supply reliability in the Bay Area. <br /> CWC §10620 (f) <br />An urban water supplier shall describe in the plan water management tools and options used by that entity that <br />will maximize resources and minimize the need to import water from other regions.