My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 2025 Urban Water Management Plan <br />Plan Introduction City of Pleasanton <br /> Public Draft | May 2026 <br /> 1-1 EKI Environment & Water, Inc. <br />1 PLAN INTRODUCTION <br />This section provides an overview of the City of Pleasanton’s (Pleasanton, or City) 2025 Urban Water <br />Management Plan (UWMP or Plan), including the Plan’s purpose, its relationship to the California Water <br />Code (CWC) and to other local and regional planning efforts, its contents, and special considerations. <br />This 2025 UWMP has been prepared jointly by City staff and EKI Environment & Water (EKI), in accordance <br />with the California Department of Water Resources (DWR) 2025 UWMP Guidebook.1 <br />1.1 Background and Purpose <br />The City is an urban retail water supplier that distributes water directly to individual water users (e.g., <br />residents and businesses). The City purchases most of its supply from an urban wholesale water supplier, <br />Alameda County Flood Control District Zone 7 (Zone 7 Water Agency [Zone 7]). In addition to the City, <br />Zone 7 also supplies wholesale water to several other retailers: the California Water Service-Livermore <br />District (Cal Water), City of Livermore (Livermore), and Dublin San Ramon Services District (DSRSD). <br />This UWMP is a foundational document and information source that reflects Pleasanton’s historical and <br />projected water demands, water supplies, supply reliability and potential vulnerabilities, water shortage <br />contingency planning, and demand management programs. Among other purposes, this UWMP may be <br />used as: <br />• A long-range planning document for water supply reliability and system planning; and <br />• A source for data on population, housing, water demands, water supplies, and capital <br />improvement projects used in: <br />- Regional water resource management plans prepared by wholesale water suppliers and <br />other regional planning authorities (as applicable), <br />- General Plans prepared by cities and counties, and <br />- Statewide and broad regional water resource plans prepared by DWR, the State Water <br />Resources Control Board (SWRCB), or other state agencies. <br />This Plan is an update to Pleasanton’s 2020 UWMP, which was adopted in 2021. This 2025 UWMP retains <br />information from the 2020 UWMP that remains current and relevant, incorporates updates, and includes <br />additional information required by subsequent amendments to the Urban Water Management Planning <br />Act (UWMP Act) (CWC §10610-10657). Although this Plan is an update to the 2020 UWMP, it was <br />developed to be a self-contained, stand-alone document and does not require readers to reference <br />information contained in previous UWMP updates. <br />1.2 UWMP Act and California Water Code <br />The UWMP Act requires urban water suppliers to prepare an UWMP every five years and to submit this <br />plan to DWR, the California State Library, and any city or county within which the supplier provides water <br />supplies. All urban water suppliers (either publicly or privately owned) in California are required to prepare <br />a UWMP if they directly or indirectly supply municipal water to more than 3,000 customers or more than <br />3,000 acre-feet per year (AFY) (CWC §10617). <br />Initially enacted in 1983, the UWMP Act has been amended over time in response to water resources <br />challenges and planning imperatives confronting California. A significant amendment was made in 2009 <br /> <br />1 The Final 2025 UWMP Guidebook is available at: https://data.cnra.ca.gov/dataset/2025-uwmp-reporting
The URL can be used to link to this page
Your browser does not support the video tag.