My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 2025 Urban Water Management Plan <br />Plan Introduction City of Pleasanton <br /> Public Draft | May 2026 <br /> 1-2 EKI Environment & Water, Inc. <br />following the Governor’s call for a statewide reduction in urban water use, referred to as the Water <br />Conservation Act of 2009 or Senate Bill (SB) X7-7. This amendment required urban retail water suppliers <br />to establish water use targets for 2015 and 2020 that would result in statewide water savings of 20% by <br />2020. To be eligible for state grants or loans, urban retail water suppliers were required to comply with <br />SB X7-7 through reporting progress toward meeting SB X7-7 water use targets in 2015 and 2020 UWMPs. <br />Section 5 of this Plan addresses this requirement. <br />In 2016, Governor Brown signed Executive Order (EO) B-37-16 Making Conservation a California Way of <br />Life (MCCWL). Subsequently, the Legislature passed SB 606 and Assembly Bill (AB) 1668, which added new <br />drought planning requirements, including: <br />1) Additional Water Shortage Contingency Plan (WSCP) requirements (CWC §10640), <br />2) Drought risk assessments (DRAs) to assess water supply reliability in UWMPs for a drought period <br />lasting five consecutive water years (CWC §10635(b)), and <br />3) Annual water supply and demand assessments to determine water supply reliability for the <br />current year and one subsequent dry year (CWC §10632(a)). <br />These elements are included in Section 7 and Section 8 of this Plan. Additionally, SB 606/AB 1688 set new <br />requirements for urban water suppliers to further increase water use efficiency beyond SB X7-7. <br />Beginning in 2024, agencies were required to report an annual Urban Water Use Objective (UWUO). <br />Because compliance with the UWUO requirements falls under the authority of the SWRCB, it is not <br />included in this Plan. Section 4.9 of this Plan documents Pleasanton’s continued compliance with the <br />UWUOs. <br />The UWMP Act contains numerous other requirements that a UWMP must satisfy. Appendix A lists each <br />of these requirements and where in the Plan they are addressed. <br />1.3 UWMP Relationship with Other Efforts <br />This Plan provides information specific to water management and planning within Pleasanton’s service <br />area. However, water management does not happen in isolation; there are other planning processes that <br />integrate with the UWMP to accomplish urban planning. Some of these relevant planning documents <br />include: <br />• Plan Bay Area. Jointly developed by the Association of Bay Area Governments (ABAG) and the <br />Metropolitan Transportation Commission, Plan Bay Area guides transit-oriented investments <br />related to public transit, housing, land use, and sustainability across the nine-county San <br />Francisco Bay Area. While Plan Bay Area 2050 is the most recent update, which involves a <br />planning horizon through the year 2050, Plan Bay Area 2040 is referenced within this UWMP, as <br />further explained in Section 3.3. <br />• Pleasanton General Plan 2005-2025: Land Use Element. The General Plan summarizes the City’s <br />historical and existing land uses and describes areas of special interest for ongoing <br />development. The General Plan also provides policies and guidance for future development, <br />including specific plans for individual projects and general guidance for encouraging sustainable <br />growth while preserving Pleasanton’s residential neighborhoods and open space. <br />• Pleasanton 2023-2031 Housing Element. The City’s 2023-2031 Housing Element evaluates <br />existing housing stock and inventories sites suitable for potential housing development. The <br />2023-2031 Housing Element compares the City’s available housing supply to its assigned share <br />of the Regional Housing Needs Allocation (RHNA) and outlines a rezoning program to <br />accommodate anticipated future housing needs in the City.
The URL can be used to link to this page
Your browser does not support the video tag.