My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton | Water Shortage Contingency Plan <br /> Public Draft | May 2026 <br /> 6 EKI Environment & Water, Inc. <br />The City uses planned unconstrained water demands as input to the AWSDA for the current year and the <br />following one dry year. Unconstrained water demands are customer demands where no water <br />conservation measures are in effect. In planning for water demands, the City considers the following <br />factors, as applicable and appropriate: <br />1. Weather conditions <br />2. Water year type <br />3. Population changes (e.g., due to development projects) <br />4. Anticipated new demands (e.g., changes to land use) <br />5. Pending policy changes that may impact demands <br />6. Infrastructure operations <br />Similarly, when describing water demands for the AWSDA, the City generally uses Section 4 (Water Use <br />Characterization) of the 2025 UWMP, including the demand projections. If the demand projections differ <br />between the AWSDA and the UWMP, the City provides an explanation for the difference. <br />In preparing the AWSDA, Pleasanton uses the following assessment methodology and criteria to evaluate <br />the City's water supply reliability for the current year and following one dry year. <br />• The City uses a spreadsheet to plan for current year and future year supply and demands. <br />Planned supply and demand inputs are entered into the spreadsheet in annual increments. As <br />needed, the increments may be revised to monthly or seasonal periods to more closely evaluate <br />specific conditions and needs. <br />• Supply and demand are compared to determine the City’s water supply reliability in the current <br />year and the following one dry year. The City’s water supply is deemed reliable if it can meet <br />planned water demands in both the current year and the following dry year. If water supply <br />cannot meet planned water demands in the current year or the following dry year, the extent of <br />the water shortage condition is determined, and the City prepares response actions in <br />accordance with this WSCP. <br />• Findings from the AWSDA are presented to City Council for consideration, along with <br />recommendations for action. <br />3 SIX STANDARD WATER SHORTAGE LEVELS <br />To provide a consistent regional and statewide approach for conveying the relative severity of water <br />supply shortage conditions, the State has established six standard water shortage levels that correspond <br />to progressive reductions of up to 10, 20, 30, 40, 50%, and greater than 50% from the normal reliability <br />condition. Each shortage condition should correspond to additional actions water suppliers would <br />implement to meet the severity of the impending shortages. <br />A water supplier may use its own shortage levels if a crosswalk is included relating its existing shortage <br />levels to the six standard levels; however, the City’s stages align with the State’s, as described in PMC <br />§9.30.060 and as indicated in Table 3.
The URL can be used to link to this page
Your browser does not support the video tag.