My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton | Water Shortage Contingency Plan <br /> Public Draft | May 2026 <br /> 5 EKI Environment & Water, Inc. <br />Table 2. Schedule of Decision-Making Activities if Water Shortage Condition Exists <br />Schedule Activities Responsible <br />Party <br />January - March <br />If a water shortage emergency condition exists, prepare <br />recommendations on water shortage condition determination <br />and action based on AWSDA findings. Prepare resolutions <br />approving determinations and actions. <br />WSR Team <br />April <br />Coordinate with the region’s water service providers, and with <br />Alameda County for the possible proclamation of a local <br />emergency. <br />WSR Team <br />1st or 2nd City Council <br />meeting in May <br />Present finalized determinations and recommendations, along <br />with resolutions approving determinations and actions. WSR Team <br />1st or 2nd City Council <br />meeting in May <br />Receive presentation of finalized determinations and <br />recommendations. Make determination of degree of <br />emergency and act on resolutions that declare a water <br />shortage emergency condition. Authorize water shortage <br />response actions for implementation. <br />City Council <br />After City Council <br />meeting <br />If a water shortage emergency condition is declared, <br />implement the WSCP (consistent with Pleasanton Municipal <br />Code Chapter 9.30) and the water shortage response actions <br />as approved by the City Council. <br />WSR Team <br />May - June Finalize AWSDA and Annual Water Shortage Assessment <br />Report. WSR Team <br />By July 1 Submit final AWSDA and Annual Water Shortage Assessment <br />Report to DWR. WSR Team <br />2.2 Data and Methodologies <br />The State requires that the AWSDA evaluate supplies and demands for, at a minimum, the current year <br />and one subsequent dry year to determine water supply reliability. The City uses planned water supply <br />and demand for the current year and a subsequent dry year for AWSDA reporting. In planning for water <br />supplies, the following factors are considered as applicable and appropriate: <br />1. Zone 7 water supply availability <br />2. Hydrological conditions <br />3. Regulatory conditions <br />4. Contractual constraints <br />5. Water quality conditions <br />6. Groundwater well production limitations <br />7. Infrastructure capacity constraints or changes <br />8. Capital improvement project implementation <br />When describing water supply sources for the AWSDA, the City generally uses Section 6 (Water Supply <br />Characterization) of the 2025 UWMP, including the supply projections. If supply sources and projections <br />differ between the AWSDA and the UWMP, the City provides an explanation for the difference.
The URL can be used to link to this page
Your browser does not support the video tag.