My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 2025 Urban Water Management Plan <br />Service Area Description City of Pleasanton <br /> Public Draft | May 2026 <br /> 3-6 EKI Environment & Water, Inc. <br />• Section 4 Water Use Characterization – specifically, Section 4.7 discusses potential climate <br />change impacts on water demands; <br />• Section 6 Water Supply Characterization – specifically, Section 6.10.1 discusses potential climate <br />change impacts on supplies; and <br />• Section 7 Water Supply Reliability Assessment. <br />3.3 Population and Demographics <br /> <br />As a midsize suburban city, the City is known as a desirable place to live and work, with a high-quality <br />school system, parks and recreational facilities, a traditional downtown area, and a low crime rate. Land <br />use planning within the City’s service area is guided by the 2005-2025 General Plan and 2023-2031 <br />Housing Element. <br />Single-family residential development remains the largest water customer sector in Pleasanton (46% of <br />all potable demands in 2025). <br />3.3.1 Population <br />The estimated historical and current population served by the City is based on California Department of <br />Finance (DOF) population estimates and Decennial Census data (Figure 3-5). <br />Pleasanton’s service area population in 2025 was 77,232, a noteworthy decrease compared to the <br />population in 2020. This decrease can be attributed to demographic fluctuations from the COVID-19 <br />pandemic. Before 2020, the City experienced steady population growth, averaging approximately 1.1% <br />annually over the previous two decades. <br />The City anticipates population growth to resume between 2025 and 2030 at a reduced rate of roughly <br />0.6% per year. Beyond 2030, population growth is projected to rebound to pre-pandemic rates, averaging <br />approximately 1.2% annually. By 2045, the total population within Pleasanton’s service area is expected <br />to be 94,407. <br />Future population projections are consistent with other local planning documents, including DSRSD’s <br />Regional Wastewater Treatment Plant (WWTP) Master Plan. DSRSD’s WWTP Master Plan Update relies <br />on Plan Bay Area 2040 4 projected population growth rates through 2040 (ABAG, 2017). Population <br />projections are derived from the City’s 2024 WDSCMP, which reflects the growth projected in the City’s <br />2023-2031 Housing Element (Pleasanton, 2024). <br />Pleasanton’s current and projected service area population are shown in Table 3-2 and Figure 3-5 in five- <br />year increments through 2045. <br /> <br />4 DSRSD’s WWTP Master Plan update is currently in process of development and uses Plan Bay Area 2040 <br />Projections by Jurisdiction, as summarized in the City of Dublin’s 2023-2031 Housing Element. Plan Bay Area 2050 <br />projections are not used because they are based on subcounty areas (super-districts), which are a combination of <br />cities, towns, and unincorporated areas. <br /> CWC §10631 <br />(a) Describe the service area of the supplier, including current and projected population … other social, economic <br />and demographic factors affecting the supplier’s water management planning. The projected population <br />estimates shall be based upon data from the state, regional, or local service agency population projections within <br />the service area of the urban water supplier and shall be in five-year increments to 20 years or as far as data is <br />available.
The URL can be used to link to this page
Your browser does not support the video tag.