Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-10 EKI Environment & Water, Inc. <br />management actions. The update included revised minimum thresholds and measurable objectives where <br />appropriate, updated water budget analyses, enhanced evaluation of interconnected surface water <br />conditions, and documentation of ongoing management measures such as the GPQ, artificial recharge <br />operations, and monitoring programs. DWR approved the first Periodic Evaluation of the Alternative GSP <br />in June 2024, confirming that Zone 7 continues to meet SGMA requirements and is managing the Basin <br />sustainably. <br />Under SGMA, Zone 7 is also responsible for annual reporting and Five-Year Periodic Evaluations to <br />demonstrate continued progress toward sustainability. Zone 7’s latest Annual Report was developed for <br />Water Year 2025. The second Five-Year Periodic Evaluation of the Alternative GSP is being prepared and <br />is due to DWR by December 21, 2026. <br />6.2.3.1 Sustainable Yield and Allocation across Main Basin Groundwater Users <br />Zone 7 continues to operate the Basin within its Sustainable Yield over a long-term period (10 years) and <br />manage groundwater resources to prevent significant chronic lowering of groundwater levels and <br />reduction of groundwater storage. Zone 7 determined historic lows by measuring groundwater elevations <br />in multiple Main Basin wells and identifying the minimum observed level. Zone 7 also defines operational <br />storage as the difference in surface water elevation between a full Main Basin and its historic low. The <br />total storage capacity of the Basin is about 254,000 AF, of which about 126,000 AF is managed as <br />operational storage (Zone 7, 2026). Moreover, pumping is managed to keep groundwater within the <br />operational storage band and above emergency reserved levels. <br />Using over a century of hydrologic records and projected future recharge conditions, the long-term <br />natural sustainable yield of the Main Basin was determined to be 13,400 AFY, which is about 11% of the <br />operational storage. Table 6-1 summarizes how this sustainable yield is allocated among non-Zone 7 <br />groundwater users. <br />Table 6-1 Natural Sustainable Yield Demand Components <br />Demand Component of the <br />Sustainable Yield Sustainable Average (AFY) <br />Pleasanton 3,500 <br />Cal Water 3,069 <br />DSRSD 645 <br />Other Groundwater Pumping 1,186 <br />Agricultural Pumping 400 <br />Mining Area Losses 4,600 <br />Total 13,400