My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-11 EKI Environment & Water, Inc. <br />Each Zone 7 retailer has an established GPQ 12 that matches the sustainable yield averages shown in Table <br />6-1. Sustainable averages are maintained by allowance of “carryover”, which is limited to 20% of the GPQ <br />(i.e., 700 AFY for the City), when less than the GPQ is used in a year. A retailer must pay a “recharge fee” <br />for pumping groundwater more than its GPQ and any carryover. The fee covers the cost of importing and <br />recharging additional water into the Main Basin. This practice helps avoid repeating historical trends in <br />over-drafting the Basin. <br />Historically, Pleasanton pumped its own GPQ; however, the City stopped operating its production wells in <br />2022 due to PFAS in the groundwater supply. Pleasanton is working with Zone 7 to construct and begin <br />operation of new wells outside of the known PFAS contamination plume. The new wells are expected to <br />come online before 2030 and will allow Pleasanton continue pumping its full GPQ. <br />In terms of the other Zone 7 retailers: Cal Water pumps its own GPQ; Zone 7 pumps DSRSD’s GPQ; and <br />Livermore has not utilized its GPQ for many years. The balance of the natural sustainable yield is pumped <br />for other municipal, agricultural, and gravel mining uses. <br />6.2.3.2 Zone 7’s Groundwater Pumping and Monitoring Strategy <br />Zone 7's groundwater production for its treated water system does not use the natural sustainable yield <br />from the Main Basin; instead, Zone 7 pumps only water that has been recharged as part of its artificial <br />recharge program using its available surface water supplies. During high-demand periods, groundwater is <br />used to supplement surface water supply delivered via the SBA. Groundwater is also used when the SBA <br />is out of service due to maintenance and improvements or when Zone 7’s surface water treatment plants <br />(WTP) are operating under reduced capacity due to construction, repairs, etc. Finally, Zone 7 taps into its <br />stored groundwater under emergency or drought conditions, when there may be insufficient surface <br />water supply available. Zone 7 also pumps groundwater out of the Main Basin during normal water years <br />to help reduce the salt loading in the Main Basin in accordance with the Salt Management Plan. <br />6.2.3.3 Artificial Recharge and Groundwater Extraction by Zone 7 <br />Before the construction of the SWP in the early 1960s, groundwater was the sole water source for the <br />Livermore-Amador Valley. This resource has gone through several periods of extended withdrawal and <br />subsequent recovery. The Main Basin was over drafted in the early 1960s when approximately 110,000 <br />AF of groundwater was extracted. The Main Basin was allowed to recover from 1962 to 1983. It was during <br />this era that Zone 7 first conducted a program of groundwater replenishment by recharging imported <br />surface water via its streams or arroyos (“in-stream recharge” or “artificial recharge”) for storage in the <br />Main Basin, supplying treated surface water to customers to augment groundwater supplies, and <br />regulating municipal pumping by other users. <br />Zone 7 actively manages the Basin under a conjunctive use strategy designed to balance natural recharge, <br />artificial recharge, and groundwater extraction. Zone 7's operational policy is to maintain the balance <br />between the combination of natural and artificial recharge and withdrawal or pumping to maintain <br />groundwater levels above the emergency reserve storage, thereby preserving a reliable drought buffer. <br />Artificial recharge operations provide the ability to store surplus imported and local surface water during <br />wet periods for later recovery during dry conditions, enhancing overall supply reliability. This conjunctive <br />use framework allows Zone 7 to adaptively shift between surface water and groundwater sources <br />depending on hydrologic conditions, operational needs, and regulatory constraints. Figure 6-3 shows Zone <br />7’s artificial recharge and pumping from 1974 through 2025. <br /> <br />12 The Groundwater Pumping Quota was formerly referred to as the “Independent Quota” in the original Municipal <br />and Industrial Water Supply Contract between Zone 7 and each retailer.
The URL can be used to link to this page
Your browser does not support the video tag.