Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-13 EKI Environment & Water, Inc. <br /> Figure 6-4 Main Basin Groundwater Storage <br />Zone 7 is continuing to study the Basin and develop new tools (including an improved groundwater model <br />completed in 2025 and a Decision Support Tool completed in 2026) to better understand the levels of <br />groundwater extraction possible under various conditions and contributing factors, such as groundwater <br />connectivity, spatial distribution in the Main Basin, and others. These efforts strengthen Zone 7’s ability <br />to sustainably manage the Basin and maintain a resilient long-term water supply portfolio. Section 7.1.2 <br />presents additional information related to groundwater supply reliability. <br />6.2.3.4 Groundwater Quality Monitoring and Protection <br />Zone 7 chloraminates groundwater supply to match the disinfectant residual in the transmission system. <br />In terms of groundwater supply, several constituents of concern have been identified throughout the <br />Basin. Zone 7 is actively implementing both monitoring and management programs to protect water <br />quality in the Basin and ensure that Zone 7 continues to provide safe and reliable drinking water, as <br />discussed in the following subsections and in Section 7.1.2. <br />6.2.3.4.1 Salinity and Nutrient Management <br />Zone 7 is actively implementing its Salt and Nutrient Management Plan (SNMP). Basin salt levels are being <br />addressed primarily through groundwater pumping and demineralization using the Mocho Groundwater <br />Demineralization Plant (MGDP) in the Mocho Wellfield. Simultaneously, the Basin is being recharged with <br />water containing low salt concentrations. The facility allows for the export of concentrated minerals or <br />salts from the Main Basin while improving the water quality of treated water. The MGDP is expected to <br />be offline from 2026 to 2028 while a new PFAS treatment facility is constructed at the Mocho Wellfield. <br />Zone 7 will continue its Basin management under the SNMP while the facility is down. <br />6.2.3.4.2 PFAS Management <br />In November 2022, Pleasanton ceased production in all three of its active municipal wells due to PFAS <br />detections. Following the shutdown, in 2023, Pleasanton and Zone 7 agreed to collaborate on the Joint <br />Groundwater Wells project. The project involves the design and installation (i.e., drilling and equipping) <br />of new municipal production wells within the Bernal Subbasin, which is believed to be outside the existing <br />PFAS plume based on Zone 7 testing and groundwater modeling.