My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-12 EKI Environment & Water, Inc. <br /> Figure 6-3 Artificial Recharge, Pumping, and Net Cumulative Impacts to Operational Storage <br />Over the past five years, Zone 7 has generally been able to meet groundwater production needs while <br />maintaining basin storage within sustainable ranges. Although recent drought conditions resulted in <br />temporary localized groundwater level declines that affected production at certain wells, these impacts <br />were managed within the broader conjunctive use system which allowed groundwater levels to <br />subsequently recover and did not compromise overall supply reliability. Zone 7 was able to meet its <br />demand in all prior years. <br />Zone 7 has continued to operate the Basin within its Sustainable Yield over a period of at least 10 years <br />and is meeting the sustainability goal defined for the Basin. Groundwater levels have remained stable or <br />generally increased over the past 10 years, demonstrating continued sustainable groundwater <br />management practices. Groundwater storage in the Basin from 1974 to 2025 is shown in Figure 6-4. <br />Ongoing basin monitoring and implementation of the Alternative GSP ensure that groundwater extraction <br />remains sustainable and protective of long-term basin health.
The URL can be used to link to this page
Your browser does not support the video tag.