Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-25 EKI Environment & Water, Inc. <br />6.6 Desalinated Water Opportunities <br /> <br />Due to infeasibility, Pleasanton is not considering the development of a desalinated water system as a <br />source of water within the planning horizon. This includes ocean water, brackish water, and groundwater <br />desalination (though Zone 7 desalinates a portion of its groundwater). <br />6.7 Water Exchanges and Transfers <br /> <br />Pleasanton currently does not have any potable water transfer agreements, nor does the Pleasanton <br />anticipate participating directly in any such transfer opportunities in the future. Pleasanton has two <br />existing pipeline interties with DSRSD and one pipeline intertie with the Livermore for rapid emergency <br />response. These interties are strictly for emergency conditions, such as a major pipeline break, supply <br />contamination, or water service interruption due to earthquakes, floods, or other disasters. <br />Zone 7 periodically supplements existing supplies with short-term transfers when needed and intends to <br />more regularly acquire transfer water over the coming decade until major supply reliability project(s) <br />come online starting around 2035. The proposed water transfers include supply from the Yuba Accord <br />and the Dry Year Transfer Program (DYTP) administered by the SWCs. Transfers could also involve <br />agreements between Zone 7 and other SWCs and/or between Zone 7 and other water purveyors. The <br />DYTP coordinates and negotiates water sales between interested SWCs and sellers in the Feather River <br />watershed. The most expedient and cost-effective transfer option is likely a transfer agreement with <br />another SWC using the SWP system that Zone 7 already invests in. Transfer water would be conveyed to <br />Zone 7 through the Delta and the SBA; the transfer amount could vary from year-to-year depending on <br />hydrology. For the 2025 UWMP, Zone 7 is assuming 3,000 AFY in water transfers through 2035. <br />Additionally, in some years, Zone 7 participates in water transfers as a seller. For example, this was the <br />case in 2023 and 2025 when Zone 7 transferred 8,000 AF and 4,000 AF (respectively) to other SWCs. These <br />transfers were non-permanent Table A transfers. <br />Zone 7 will continue to pursue and evaluate transfer opportunities in the Bay Area and statewide. Through <br />the Bay Area Regional Reliability (BARR) Partnership, Zone 7 participated in a regional project, funded in <br />part by a U.S. Bureau of Reclamation grant, to develop the Bay Area Shared Water Access Program that <br />identified water transfer opportunities and a roadmap to facilitate transfers and exchanges among water <br />suppliers the Bay Area. <br />As discussed in Section 6.8.1.1, the Delta Conveyance Project may also create opportunities for long-term <br />water transfers between SWCs across the state. <br /> CWC §10631(g) A plan shall be adopted in accordance with this chapter and shall do all of the following: <br />Describe the opportunities for development of desalinated water, including, but not limited to, ocean water, <br />brackish water, and groundwater, as a long-term supply. <br /> CWC §10631 (c) A plan shall be adopted in accordance with this chapter and shall do all of the following: <br />Describe the opportunities for exchanges or transfers of water on a short-term or long-term basis.