Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-26 EKI Environment & Water, Inc. <br />6.8 Future Water Projects <br /> <br />Pleasanton itself does not have any plans for new water supply projects (Table 6-8). <br />However, as described in Section 6.2.3.4, Pleasanton is working with Zone 7 to develop new groundwater <br />wells to enable the City access to its full GPQ. This project is intended to allow Pleasanton to continue <br />accessing its existing supplies (rather than developing new supplies). <br />Table 6-8 Expected Future Water Supply Projects or Programs (DWR Table 6-7) <br />☒ No expected future water supply projects or programs that provide a quantifiable <br />increase to the agency's water supply. <br />As Zone 7 purchases are Pleasanton’s primary source for potable water, the City supports Zone 7’s efforts <br />to pursue opportunities to improve water supply reliability. As SWP reliability continues to decline and <br />the Tri-Valley population grows, Zone 7 anticipates future supply deficits and, as a result, is pursuing <br />several opportunities to obtain additional water storage and water supplies, address the need for <br />alternative conveyance in the Delta, and improve access to groundwater and local emergency supplies. <br />As part of the 2022 WSE Update, Zone 7 evaluated potential future water projects and anticipated <br />contributions to improving reliability of its water supply system. Zone 7 expects that a portfolio (i.e., likely <br />a subset) of projects will be needed to address future supply deficits. Projects that Zone 7 is continuing to <br />consider are described in the following subsections. <br />6.8.1 Supply Projects <br />6.8.1.1 Delta Conveyance Project <br />The Delta, a key conveyance component of the SWP, is increasingly threatened by ecosystem <br />considerations, seismic risk, and climate change/sea level rise, reducing the reliability of the SWP system. <br />The Delta Conveyance Project (DCP) will reduce these risks and partially restore the SWP’s projected <br />reliability. <br />In early 2019, Consistent with Executive Order N-10-19, the state announced a single tunnel project, which <br />proposed a set of new diversion intakes along the Sacramento River in the north Delta for the SWP. In <br />2019, DWR initiated planning and environmental review for the single tunnel (i.e., the DCP) to protect the <br />reliability of SWP supplies from the effects of climate change and seismic events, among other risks. On <br />December 21, 2023, DWR certified the Environmental Impact Report and approved the DCP selecting <br />Bethany Reservoir Alignment for further engineering, design, and permitting. DWR received the Incidental <br />Take Permit for the DCP from the California Department of Fish and Wildlife (DFW) in February 2025. <br />Currently, DWR is in the process of obtaining a change in point of diversion permit from the SWRCB to <br /> CWC §10631 A plan shall be adopted in accordance with this chapter and shall do all of the following: <br />(b) (3) For any planned sources of water supply, a description of the measures that are being undertaken to <br />acquire and develop those water supplies. <br />(f) Include a description of all water supply projects and water supply programs that may be undertaken by the <br />urban water supplier to meet the total projected water use, as established pursuant to subdivision (a) of Section <br />10635. The urban water supplier shall include a detailed description of expected future projects and programs <br />that the urban water supplier may implement to increase the amount of the water supply available to the urban <br />water supplier in normal and single-dry water years and for a period of drought lasting five consecutive water <br />years. The description shall identify specific projects and include a description of the increase in water supply that <br />is expected to be available from each project. The description shall include an estimate with regard to the <br />implementation timeline for each project or program.