My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-28 EKI Environment & Water, Inc. <br />provide water supply, environmental, flood and recreational benefits. The proponents of Sites Reservoir <br />include 30 entities including several individual SWP Public Water Agencies. Sites Reservoir is expected to <br />provide approximately 205,000 AF (Sites Reservoir Final Environmental Impact Report/Environmental <br />Impact Statement, Table 5-30, Alternative 3) of additional deliveries on average to participating agencies <br />under existing conditions. Sites Reservoir is currently undergoing environmental planning and permitting. <br />Sites Reservoir project filed a water rights petition and is expected to receive a water right permit in 2026 <br />from the SWRCB. DWR estimates of SWP supply reliability in its Draft 2025 DCR are based on existing <br />facilities, and do not include the proposed Sites Reservoir. <br />Zone 7 participates in the project as a member of the Reservoir Committee. Composed of 22 water <br />suppliers from across California that are investing in the project, the Reservoir Committee provides <br />recommendations to the Sites Project Authority to help advance the project. <br />For planning and budgeting purposes, Zone 7 anticipates its share of flow releases from Sites Reservoir to <br />average 5,000 AFY. Yet, the average annual water supply from Sites Reservoir is estimated to be 4,000 <br />AFY after accounting for carriage water (i.e., supply losses as the water flows through the Delta). This level <br />of water supply is equivalent to Zone 7’s likely share of storage in the reservoir, assumed to be about <br />31,170 AF (or 3% of the storage capacity allocated to participating water agencies). As currently <br />envisioned, Sites Reservoir would be utilized by Zone 7 as a water supply for all year types (i.e., wet, <br />average, and dry years). <br /> <br />Source: Sites Project Authority <br />Figure 6-5 Sites Reservoir Project: Location and Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.