Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-27 EKI Environment & Water, Inc. <br />add the two proposed DCP diversion intakes to the SWP’s water rights. In October 2025, DWR certified <br />that DCP is consistent with the Delta Plan. DWR is continuing with design refinements, environmental <br />planning and permitting through 2026-27, including resolving appeals on its Delta Plan certification. DCP <br />will potentially be operational in 2045 following extensive planning, permitting and construction. <br />DWR estimates of SWP supply reliability in the Draft 2025 DCR are based on existing facilities and do not <br />include the proposed DCP. Since this UWMP uses DWR’s Draft 2025 DCR to estimate SWP supplies at <br />2043, any changes in SWP reliability resulting from the proposed DCP are not included in this UWMP. <br />Most recent DWR estimates indicate that the DCP is expected to increase SWP Delta exports by about <br />467,000 AFY on a long-term average under current climate conditions. <br />The Zone 7 Board has approved funding and participation in planning, permitting, and other pre- <br />construction work of the DCP through 2027. The Zone 7 Board has not yet decided whether to participate <br />in construction of the project. For planning purposes, the 2025 UWMP does not include DCP, since it is <br />expected to come online around 2045, near the end of Zone 7’s future planning period. <br />Continued participation by Zone 7 in the planning efforts will allow Zone 7 to elect to participate in the <br />DCP implementation in the future based on information developed in the planning process, allow access <br />by Zone 7 to information related to benefits and costs, and provide Zone 7 influence throughout the <br />process. The work over the next two to four years will inform the Zone 7 Board’s decision-making as the <br />DCP continues to advance. <br />6.8.1.2 Potable Reuse <br />Potable reuse involves advanced treatment of recycled water to produce purified water to supplement <br />potable water supplies. Though Zone 7 does not currently have a potable reuse project planned, Zone 7 <br />and its three other Tri-Valley retailers are evaluating this option as a potential source of new supply. While <br />recycled water for non-potable uses (e.g., irrigation) has been available for many years in the Tri-Valley, <br />potable reuse would be a new use of local wastewater resources collected by DSRSD and Livermore, if <br />implemented. Its main benefits include local production and control, drought-resilient supply, and <br />resource recovery. <br />Although Zone 7 does not provide recycled water, its retailers have provided recycled water service for <br />many years. Initiating potable reuse in the Tri-Valley would involve a partnership between Zone 7 and its <br />participating retailers to manage the wastewater collection and treatment, and purified water production <br />and distribution/storage. Local wastewater resources would be collected by DSRSD and/or Livermore and <br />treated to meet drinking water standards. Following treatment, potential purified water uses could <br />include: 1) groundwater augmentation or recharge, 2) storage in the COLs, and/or 3) raw water <br />augmentation to Zone 7’s Del Valle Water Treatment Plant (DVWTP). <br />Zone 7 collaborated with Tri-Valley retailers to develop the Joint Tri-Valley Potable Reuse Feasibility Study <br />in 2018, which evaluated the feasibility of potable reuse in the Tri-Valley. An updated study may be <br />developed in upcoming years. Zone 7 also participated with ACWD, Livermore, DSRSD, LAVWMA, and <br />Union Sanitary District on a project which developed outreach materials in 2025 to support purified water <br />awareness. <br />This 2025 UWMP does not include potable reuse as a future supply for the City and does not assume <br />potable reuse to be part of Zone 7’s supply portfolio. <br />6.8.1.3 Sites Reservoir <br />Sites Reservoir is a proposed new 1,500,000 AF off-stream storage reservoir in northern California near <br />Maxwell. Sacramento River flows will be diverted during excess flow periods and stored in the off-stream <br />reservoir and released for use in the drier periods. Shown in Figure 6-5, Sites Reservoir is expected to