Laserfiche WebLink
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-11 EKI Environment & Water, Inc. <br />Table 7-3 Zone 7’s Water Supply Volume Available <br />Water Source(a) <br />Normal <br />Year <br />Single <br />Dry Year <br />Multi-Year Drought <br />Year 1 Year 2 Year 3 Year 4 Year 5 <br />(AF) (AF) (AF) (AF) (AF) (AF) (AF) <br />SWP – Table A (b) 36,574 1,229 9,303 7,961 32,793 4,897 5,185 <br />SWP – Carryover (c) 10,000 10,000 10,000 8,858 8,864 6,802 0 <br />Water Transfers (d) 0 0 0 0 0 0 0 <br />Arroyo Valle 4,000 4,000 4,000 209 258 60 4,381 <br />Sites Reservoir(e) 2,185 10,511 8,909 12,085 1,834 214 755 <br />From Storage <br />Main Basin(f) 30,000 30,000 30,000 30,000 30,000 30,000 24,343 <br />Non-Local Storage <br />Programs(g) 19,741 16,600 16,600 16,600 19,268 16,600 9,448 <br />Chain of Lakes(h) 11,700 11,700 11,700 14,586 13,868 0 0 <br />Total 114,200 84,040 90,512 90,299 106,885 58,573 44,112 <br />Percent of Normal 100% 74% 79% 79% 94% 51% 39% <br />NOTES: <br />(a) This table is based on Zone 7’s 2025 UWMP (Section 7.2 and Tables 7-1 to 7-9), where the reliability of each <br />water supply source is discussed. <br />(b) Based on DWR’s modeling of SWP availability in the Draft 2025 DCR. Zone 7 applied the hydrologic time series <br />from the DCR’s 2043 50% level-of-concern to model the reliability of its Table A allocations. <br />(c) Zone 7’s operational target is typically 10,000 AF for normal years. <br />(d) Beyond 2035, Zone 7 assumes that zero transfers will be available, and therefore, the values in this table are <br />zero. <br />(e) Supplies from Sites Reservoir are assumed to be available by 2035. <br />(f) These are estimated available supplies, not necessarily what would be pumped. Zone 7’s typical operational <br />target is around 5,000 AFY for normal years. <br />(g) Includes available supplies from Semitropic and Cawelo Water Districts, as well as other future supply <br />programs. Zone 7 does not typically use these available supplies during normal years. <br />(h) The Chain of Lakes Conveyance System, which provides access to water stored in the Chain of Lakes (COLs), <br />is assumed to be completed around 2035. During the five-year drought, the operational storage in COLs is <br />depleted by years four and five. <br />