My WebLink
|
Help
|
About
|
Sign Out
2025 Urban Water Management Plan
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
2025 Urban Water Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 3:07:41 PM
Creation date
5/8/2026 3:05:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-12 EKI Environment & Water, Inc. <br />7.3 Supply and Demand Assessment <br /> <br />This section presents comparisons of projected water supplies and demands from 2025 through 2045 <br />under the following hydrologic conditions: normal year, single dry year, and five consecutive dry years. <br />The City’s projected demands are presented in Section 4, while supply sources are described in Section 6. <br />Unless otherwise noted, it is assumed demand projections will not change with hydrologic conditions. In <br />other words, demands are assumed to be unconstrained unless they are limited by available supplies. <br />7.3.1 Normal Year Supply and Demand Assessment <br />The City’s normal year supplies include: <br />• Purchased supplies from Zone 7 <br />• 3,500 AFY of groundwater pumped by the City from the Main Basin <br />• Up to 1,340 AFY of recycled water <br />Based on the reliability assessment in the 2025 UWMP, Zone 7 predicts they can meet all retailer demands <br />during a normal year. Therefore, Table 7-4 shows that in normal years the City’s supplies are adequate to <br />meet projected demands. The supply and demand totals are consistent with those in Table 6-11 and <br />Table 4-5, respectively. <br />Table 7-4 Normal Year Supply and Demand Comparison (DWR Table 7-2) <br /> 2030 2035 2040 2045 <br />(AF) (AF) (AF) (AF) <br />Supply totals <br />(from DWR Table 6-9) 16,401 17,288 18,178 19,172 <br />Use totals <br />(from DWR Table 4-2) 16,401 17,288 18,178 19,172 <br />Surplus/(shortfall) 0 0 0 0 <br />7.3.2 Single-Dry Year Supply and Demand Assessment <br />In Chapter 7 of its 2025 UWMP, Zone 7 has indicated it can meet retailer demands during single dry years <br />through 2045. Therefore, Zone 7 supplies to the City are assumed to equal the City’s projected potable <br />water demands after accounting for the City’s GPQ. Recycled water supply is assumed to be unaffected <br />by the dry conditions. Table 7-5 shows that the City’s supplies are adequate to meet projected demands <br />during single dry years. <br /> CWC §10635(a) <br />Every urban water supplier shall include, as part of its urban water management plan, an assessment of the <br />reliability of its water service to its customers during normal, dry, and multiple dry water years. This water supply <br />and demand assessment shall compare the total water supply sources available to the water supplier with the <br />long-term total projected water use over the next 20 years, in five-year increments, for a normal water year, a <br />single dry water year, and a drought lasting five consecutive water years. The water service reliability assessment <br />shall be based upon the information compiled pursuant to Section 10631, including available data from state, <br />regional, or local agency population projections within the service area of the urban water supplier.
The URL can be used to link to this page
Your browser does not support the video tag.