My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 5-19-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
05192026 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 5-19-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 3:06:02 PM
Creation date
5/13/2026 2:54:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
914
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />Installation of these pedestrian and bicycle enhancements is allowed by Caltrans as part of <br />their Complete Streets design; however, the Complete Streets design may not be directly <br />applicable to overcrossings, and as a result, design standard decision documentation will be <br />required for several of the proposed elements, which requires additional Caltrans review and <br />approval. <br /> <br />DISCUSSION <br />In light of the additional documentation and oversight required by Caltrans, staff applied for a <br />competitive grant from the Alameda County Transportation Commission (Alameda CTC) to <br />complete the design work and Caltrans approval process. A $525,000 grant was awarded to <br />the City to complete the overcrossing design. A request for proposals was issued on March 4, <br />2026, and closed on April 15, 2026. The City received three proposals, with Wood Rodgers <br />Inc. ranked as the top consultant firm based on the proposal review criteria. They are identified <br />as a local business by the Alameda CTC, with an office in Pleasanton, and have proposed a <br />12-month project timeline and a not-to-exceed amount of $402,450. (See Attachment 2) <br /> <br />Wood Rodgers’s references have been checked, and the agency is in good standing, having <br />completed similar projects in Oakland, West Sacramento, and Elk Grove. <br /> <br />Schedule <br />The proposal outlines a 12-month timeline to complete the final plan set and obtain Caltrans <br />encroachment permit approval. <br /> <br />May 2026 to July 2026 Preliminary design <br />Aug 2026 to Nov 2026 65 percent design <br />Jan 2027 to Feb 2027 95 percent design <br />Nov 2026 to Apr 2027 Design Engineering Evaluation Report (DEER)/Caltrans Permit <br />May 2027 Project complete and ready to advertise for construction bids <br /> <br />EQUITY AND SUSTAINABILITY <br />The I-580 Overcrossing Pedestrian and Bicycle Improvements project will benefit both <br />Pleasanton's residents and businesses by improving access between the City of Pleasanton <br />and the City of Dublin, providing equitable access for users of the roadway network. Improved <br />pedestrian and bicycle infrastructure will reduce noise pollution and enable more active <br />transportation, fostering a more sustainable quality of life. <br /> <br />OUTREACH <br />The Bicycle, Pedestrian, and Trails Committee (BPTC) reviewed this project and supports <br />advancing it as a top three priority. The City of Dublin, Caltrans, and the Livermore / Amador <br />Valley Transit Authority (LAVTA), will have the opportunity to provide input on the project <br />design. 65 percent plans will be shared with the BPTC for review and comment. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />This project advances Goal C: Investing in Our Environment by finalizing the design of the <br />capital improvement project and enabling improved mobility through alternative transportation, <br />a priority item of the Climate Action Plan. This project also advances Goal E: Building a <br />Community Where Everyone Belongs by providing improved access, mobility, and safety for all <br />road users. <br />Page 171 of 908
The URL can be used to link to this page
Your browser does not support the video tag.