Laserfiche WebLink
PROPOSAL/CONTRACT <br />PROPOSAL DATE <br />4/1/2026 <br />PROPOSAL NUMBER <br />31421 <br />GENERAL ENGINEERING CONTRACTOR <br />WBE # 16001253 <br />SBA # 2006507 <br />7. Curb paint will bubble, chip, or peel if there are existing layers of paint. Our proposal/contract includes costs for broom cleaning of the <br />curb only. <br />8. Unless otherwise stated in the scope, the parking lot paint markings will be repainted to match the existing layout. There is no <br />corrective action of any ADA discrepancies or of any non-code compliance in this scope. ADA discrepancies may exist throughout the <br />parking area to be striped. It is recommended to consult with an attorney that specializes in ADA law or a CASp inspector for an ADA <br />assessment prior to beginning with this work. Advantage Asphalt makes no representation regarding whether any portion of this work <br />complies with ADA guidelines. <br />D1. EXCLUSIONS: <br />1. ADA upgrades or corrections to the parking lot layout. <br />2. ADA signage, unless otherwise stated in the proposal/contract. <br />3. Sand blasting or scraping of heavily painted and bubbling curb paint. <br />E. SPECIFIC TERMS AND CONDITIONS FOR ADA (American with Disabilities Act) SCOPE OF WORK: <br />1. If this Scope is based on a set of plans and a scope of work provided by BUYER, Advantage Asphalt will follow the scope and plans <br />provided. If Advantage Asphalt has designed the scope of work submitted with this proposal/contract, we will follow that scope as <br />approved by BUYER. Advantage Asphalt warranties that all work within our proposed scope is based on the standards within CA Title <br />24 and Federal ADA Accessibility Guidelines. <br />2. It is recommended that BUYER has the final plans reviewed by a CASp inspector to ensure all provisions of either the BUYER’S scope <br />or our scope are consistent with the interpretations of the local jurisdictions. Any changes to this scope of work either before or during <br />construction as requested by a CASp inspector or local jurisdiction inspector may require a Contract Change Order and BUYER may <br />incur additional charges. <br />3. If a post construction CASp inspection is required, then BUYER'S CASp certified inspector shall be present during all phases of <br />construction. If corrections to the scope are requested by the CASp inspector after the work has been completed and no CASp inspector <br />was present during construction, then BUYER may incur additional costs for any alterations to this work. <br />4. It is the BUYER'S responsibility to pull permits with the local municipality having jurisdiction. If permits are not obtained by the <br />BUYER and the city or county having jurisdiction shuts down the operation after work commences, BUYER agrees to pay Advantage <br />Asphalt for all work completed and any additional move-in costs for additional move-ins required to complete the job. <br />5. The scope of work within this proposal/contract does not (and cannot) indemnify you from every possible interpretation of these codes <br />or any future ADA/Access lawsuit brought by a party that disagrees with this scope or is just wrong in their allegations. <br />E1. EXCLUSIONS: <br />1. Civil Engineering plans or a Civil Engineer’s stamp of approval. <br />2. Engineering, building permits, encroachment permits, or any other permit, and/or fees. <br />3. Any additional work required to complete transitions to the detailed scope due to elevations or topography being <br />significantly greater than expected. <br />4. Any items not detailed in the provided scope. <br />** Scheduling of the work with a Notice to Proceed by way of an email will be considered acceptance of this contract, with all its terms, <br />and becomes legal and binding without being signed. Any email authorization to proceed with Contract Change Orders shall be <br />incorporated herein and accepted as part of this contract. <br />** Due to major instability within the oil industry, significant price spikes have been impacting our costs for materials and trucking. We <br />have attempted to absorb these costs, but they continue to increase without warning. This greatly impacts our ability to honor this <br />proposal/contract for any given length of time. Unfortunately, if our costs continue to increase beyond the day this proposal/contract was <br />given, we will have to adjust our bid to reflect these increases. We apologize for the inconvenience. <br />All work is guaranteed against failure due to faulty material or workmanship for a period of one (1) year. <br />*** Non-Payment, as per terms of contract, voids all warranties. *** <br />Page 5 of 7 <br />www.advantageasphalt.com10308 Placer Lane, Sacramento CA 95827 Tel: (916) 388-2020 Fax: (916) 388-5542 <br />Docusign Envelope ID: 42D0FC2F-328E-8A96-8129-04A8EA2105A0