My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_042726
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
042726
>
_Agenda_Packet_042726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 2:13:50 PM
Creation date
5/22/2026 2:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/27/2026
DESTRUCT DATE
15Y
Text box
ID:
1
Creator:
PLAN1
Created:
5/22/2026 2:13 PM
Modified:
5/22/2026 2:13 PM
Text:
ITEM 4 ATTACHMENT 1
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19 <br />ImprovementsUnsafe SpeedBikePedInjuryKSICorridorNo. <br />Modify signal phasing to implement a LPI and add left turn phases at key intersections <br />302561015 <br />Santa Rita Road – North City Limits to Rosewood Drive1 <br />•Phase 1: Upgrade from Class 2 buffer bike lane to Class 4 separated by reducing the travel lane. <br />Buffer can be concrete. <br />•Phase 2: Extend sidewalks to include 5' bike lanes and make intersections along the segment <br />Protected bike Intersection, include full signal upgrades to meet latest standards <br />Santa Rita Road – Stoneridge Drive to Mohr Avenue2 <br />Extend sidewalks to include 5' bike lanes and make intersections along the segment Protected bike <br />Intersection, include full signal upgrades to meet latest standardsSanta Rita Road - Stoneridge Drive to Rosewood3 <br />•Phase 1: Upgrade from Class 2 buffer bike lane to Class 4 separated by reducing the travel lane. <br />Buffer can be concrete. <br />•Phase 2: Extend sidewalks to include 5' bike lanes and make intersections along the segment <br />Protected bike Intersection, include full signal upgrades to meet latest standards <br />Santa Rita Road – Mohr Avenue to Valley Avenue4 <br />Santa Rita Road – Valley Avenue to Black Avenue5 <br />•Phase 1: Upgrade from Class 2 buffer bike lane to Class 4 separated by reducing the travel lane. <br />Buffer can be concrete. <br />•Phase 2 - Elevated Cycle Track with improved sight distances for added safety <br />Francisco to Black Improvements below: <br />•Keep Parking SB between Francisco to Black Avenue, guide bikes to the sidewalk path for <br />Amador Valley Community Park and widen that walkway for better bike/pedestrian <br />shared use path. <br />•Santa Rita Road & Francisco: <br />•Enhance intersection for added bike safety to cross Santa Rita Road <br />•Phase 1:Intersection safety improvements by Developer project on east side of intersection <br />•Phase 2:Improve west side of intersections to enhance overall bike/ped safety at intersectionSanta Rita at Valley Avenue6 <br />Raised Cycle track southbound direction (convert the bike lane to raised in the area) - existing bus <br />stop in front of Post Office to be floating bus stop in travel laneSanta Rita Road - Black Avenue to Stanley7 <br />Parallel bike facility (cycle track) that diverts on St. John St to Peters AvenueDowntown Corridor - Ray St to Old Bernal Ave8 <br />•Retroreflective backplate - all signalized locations <br />•Speed Feedback Signs - at strategic locations <br />•Upgrade from Class 2 buffer bike lane to Class 4 facility with bollards or Buffer can be landscape. <br />•Speed Cameras at all key intersections. <br />Overall Corridor Improvement9 <br />Proposed Safety Projects
The URL can be used to link to this page
Your browser does not support the video tag.