My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_042726
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
042726
>
_Agenda_Packet_042726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 2:13:50 PM
Creation date
5/22/2026 2:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/27/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Bicycle, Pedestrian & Trails <br />Committee <br />Agenda Report <br /> April 27, 2026 <br /> <br /> Item 5 <br /> <br /> <br />SUBJECT: REVIEW OF THE WEST LAS POSITAS MULTIMODAL RECONSTRUCTION <br />PROJECT PHASE II 65% DESIGN PLANS <br /> <br /> <br /> <br />SUMMARY <br />The city is working on improvements to the West Las Positas Corridor between Foothill Road <br />and Santa Rita Road to improve pedestrian and bicyclist circulation and provide safety <br />enhancements throughout the corridor as identified in the 2018 Bicycle and Pedestrian Master <br />Plan. The project also addresses the uneven roadway pavement surface as directed by the City <br />Council in 2021. These two high priority projects were combined into a single project titled “The <br />West Las Positas Multimodal Reconstruction Project”. <br /> <br />The pedestrian and bicycle components of the West Las Positas Multimodal Reconstruction <br />Project were developed with extensive public input and endorsed by the Bicycle, Pedestrian and <br />Trails Committee in December 2019 and by City Council in 2022. <br /> <br />Mark Thomas was selected as the design consultant to advance the preliminary design into a <br />full construction plan set incorporating current best practices for bicycle and pedestrian facilities. <br /> <br />They are currently preparing the West Las Positas Boulevard Phase II design, which covers the <br />segment from Stoneridge Drive to just east of Fairlands Drive. The 65% Phase II design plans <br />are being provided to the Bicycle, Pedestrian, and Trails Committee for review of the conceptual <br />design. See Attachment 1. <br /> <br />RECOMMENDATION <br />It is recommended that the Bicycle, Pedestrian & Trails Committee receive this information and <br />provide feedback as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.