My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_042726
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
042726
>
_Agenda_Packet_042726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 2:13:50 PM
Creation date
5/22/2026 2:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/27/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Bicycle, Pedestrian & Trails <br />Committee Meeting <br />Agenda Report <br /> April 27, 2026 <br /> <br />Item 6 <br /> <br /> <br />SUBJECT: RECOMMENDED USE OF MEASURE BB PEDESTRIAN AND BICYCLE <br />FUNDS FOR INSTALLATION OF RECTANGULAR RAPID FLASHING <br />BEACONS AT HOPYARD ROAD AND GOLDEN ROAD <br /> <br /> <br />SUMMARY <br />In 2018, as part of the Pedestrian and Bicycle Master Plan Update, the Bicycle, Pedestrian and <br />Trails Committee established a Measure B/BB funding allocation directing 80% of available <br />funds to the high-priority project identified in the Master Plan and 20% to other projects outside <br />the high-priority corridor. <br /> <br />Following adoption of the Trails Master Plan in 2019, the Committee revised the Measure BB <br />funding allocation to provide dedicated funding for high-priority trails projects. The current <br />allocation directs 60% of Measure BB funds to the high-priority project identified in the Bicycle <br />and Pedestrian Master Plan, 20% to other high-priority bicycle and pedestrian projects outside <br />the priority corridor, and 20% to trails projects. <br /> <br />Staff recommends that the Bicycle, Pedestrian and Trails Committee support the use of <br />approximately $12,000 in Measure BB funds to enhance crosswalk visibility at the intersection of <br />Hopyard Road and Golden Road through the installation of Rectangular Rapid Flashing <br />Beacons (RRFBs). <br /> <br />BACKGROUND <br />Measure B/BB Bicycle and Pedestrian Direct Local Distribution (DLD) funds may be used for <br />capital projects, programs, and plans that directly improve bicycle and pedestrian access, <br />convenience, safety, and use. Eligible uses include, but are not limited to: <br /> <br />• New or upgraded pedestrian facilities. <br />• New or improved bikeways. <br />• Maintenance of bicycle and pedestrian facilities. <br />• Crossing improvements. <br />• Bicycle parking. <br />• ADA on-street improvements. <br />• Pedestrian and bicycle signage. <br />• Access improvements at transit facilities. <br />• Traffic calming projects. <br />• All phases of capital projects, including feasibility, planning, and environmental review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.