My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_042726
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
042726
>
_Agenda_Packet_042726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 2:13:50 PM
Creation date
5/22/2026 2:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/27/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 of 2 <br />All projects and programs funded with Measure B or Measure BB Bicycle and Pedestrian Safety <br />DLD funds must receive City Council approval before DLD funds are expended. This approval <br />provides an opportunity for public input on bicycle and pedestrian safety improvements. Eligible <br />projects and programs may be approved through: <br /> <br />• An adopted list of Measure B/BB-funded projects. <br />• A local Bicycle and/or Pedestrian Master Plan with prioritized projects – project is <br />#27 on the prioritized list. <br />• The Capital Improvement Program. <br />• A City Council resolution, such as submitting a grant application. <br /> <br />The executive summary of the Pedestrian and Bicycle Masterplan identifies that the plan is <br />intended as a conceptual guide for City staff and members of the public, “Individual projects may <br />differ from the Plan's recommendations, but the main project alignments and policy <br />recommendations should be implemented to the greatest degree possible.” <br /> <br />This section is noted because the specific project in the masterplan is to restripe to high visibility <br />crosswalk and we are adding the RRFB’s to that design, which, while not explicitly noted, but <br />does align with the goals of the masterplan. <br /> <br />Goal 5: Improve traffic safety for all modes, and particularly the most vulnerable roadway <br />users - bicyclists and pedestrians. <br />Action 5-1A: proactively identify safety issues and implement safety countermeasures, <br />utilizing best practice engineering, enforcement, and public education tools. <br /> <br />RECOMMENDATION <br />It is recommended that the Bicycle, Pedestrian and Trails Committee support the use of <br />approximately $12,000 in Measure BB funds to enhance crosswalk visibility at the intersection of <br />Hopyard Road and Golden Road through the installation of Rectangular Rapid Flashing <br />Beacons (RRFBs). <br /> <br />ACTION <br />Support the use of approximately $12,000 in Measure BB funds for the installation of <br />Rectangular Rapid Flashing Beacons at the intersection of Hopyard Road and Golden Road. <br /> <br /> <br /> <br /> <br />Submitted by: <br /> Matthew Nelson <br />Associate Traffic Engineer
The URL can be used to link to this page
Your browser does not support the video tag.