My WebLink
|
Help
|
About
|
Sign Out
RES 2026039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 4:33:20 PM
Creation date
5/27/2026 4:29:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/19/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2026-039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Responses to Written Comments Final EIR <br /> <br /> <br />3-124 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Response to T.VINSON 1-4 <br />As noted in Draft EIR Chapter 2, Project Description, page 2-27, the proposed project would include <br />the construction of a new public access road off Dublin Canyon Road to provide access to the <br />proposed EBRPD parking lot and trailhead. Since the primary purpose of this roadway for the <br />proposed project would include new access to an EBRPD facility and is not intended to alter access <br />to the Vinson Property, the naming convention used in Appendix H of the Draft EIR is Proposed <br />EBRPD Park Driveway; the road’s permanent name will ultimately be selected by the City. <br />Pages 28 through 33 in Appendix H of the Draft EIR discuss trip generation and distribution related to <br />the proposed project. Estimated trip generation from the proposed project was based on published <br />trip generation rates from the Institute of Transportation Engineers’ (ITE) Trip Generation Manual <br />(10th Edition). Specifically, Single-Family Detached housing (ITE Code 210). Published trip rates from <br />land use of Public Park (ITE Code 411) was utilized to obtain projects trips for the proposed EBRPD <br />facilities. As such, the proposed project is expected to generate approximately 407 daily vehicle trips <br />including 22 weekday AM peak-hour trips (six inbound and 16 outbound), and 56 weekday PM peak- <br />hour trips (33 inbound and 23 outbound). These trip generation rates were then distributed along <br />the project site area based on existing travel patterns, knowledge of the study area, and consultation <br />with City staff. Figure 10: Project Trip Assignment in Appendix H of the Draft EIR, and referenced in <br />this comment letter, displays the additional vehicle trips associated with development of the <br />proposed project. This figure of the Proposed EBRPD Park Driveway is not intended to showcase the <br />total amount of vehicle trips estimated as a result of existing conditions in addition to trips from the <br />proposed project and, in turn, is not incorrect. Figure 11: Existing Plus Project Conditions Traffic <br />Volumes on page 33 in Appendix H of the Draft EIR denotes proposed project trips in addition to the <br />existing traffic volumes. Based on this data, traffic impacts resulting from the proposed project <br />would be considered less than significant based on City standards, as indicated on page 29 in <br />Appendix H of the Draft EIR. <br />As discussed in Draft EIR Chapter 2, Project Description, page 2-27, the EBRPD easement providing <br />access to the proposed trailhead would be a new paved access road along a portion of the existing <br />non-exclusive access easement located along the eastern boundary of the Lester property. The <br />proposed project would include 16 parking stalls and four trailer parking stalls for the proposed <br />EBRPD trailhead. The number of parking spaces was developed in coordination with EBRPD. As <br />noted in Draft EIR Section 3.14, Transportation, page 3.14-2, on-street parking along Dublin Canyon <br />Road is prohibited. No on-street parking spaces along Dublin Canyon Road are expected as part of <br />the proposed project. Additionally, a private access gate would be installed to restrict access beyond <br />the EBRPD trailhead. <br />This comment is included in the administrative record and will be provided to the decision-makers <br />for review and consideration. The comment did not provide new, substantial evidence with respect <br />to the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no <br />further response is required. <br />Response to T.VINSON 1-5 <br />The proposed project would increase the area of new impervious surfaces on the project site. As <br />discussed in Draft EIR Section 3.9, Hydrology and Water Quality, page 3.9-19, all on-site stormwater
The URL can be used to link to this page
Your browser does not support the video tag.