Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-125 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />flow would be directed into 10 drainage management areas (DMAs) with 10 associated bioretention <br />areas. The proposed bioretention areas are Low Impact Development techniques, consistent with <br />the County’s NPDES permit and the Clean Water Program Stormwater C.3 Guidebook, that allow for <br />stormwater infiltration into the soil and detain stormwater on-site in order to reduce peak flows and <br />prevent erosion and siltation. These bioretention areas would be designed in accordance with all <br />applicable standards with adequate capacity to accommodate stormwater flows at the project site. <br />All excess runoff from these bioretention areas would be directed into the on-site storm drain <br />system which would direct flow into the existing 12-inch storm drain line beneath Dublin Canyon <br />Road via new proposed 18-inch and 12-inch storm drains. All new proposed storm drainage facilities <br />would be sized and designed with sufficient capacity to serve the proposed project. <br />Furthermore, as noted in Draft EIR Section 3.6, Geology and Soils, the proposed project would be <br />required to comply with Municipal Code Section 9.14 which requires construction projects to <br />conform to the C.6 Construction Site Control Requirements in the San Francisco Bay Regional Water <br />Quality Control Board’s MRP (Order No. R2-2022-1108; NPDES Permit No. CAS612008). The C.6 <br />Construction Site Control Requirements mandate construction projects that disturb more than one <br />acre of land to file a Notice of Intent and prepare an erosion/pollution control plan or SWPPP to <br />obtain a Construction Stormwater General Permit. The SWPPP or erosion control plan will identify <br />site specific BMPs that will implement erosion, run-on and runoff, and sediment control measures to <br />prevent the discharge of sediments. These BMPs may include scheduling and timing of grading (soil- <br />disturbing) activities, timely revegetation of graded areas, use of hydroseed and hydraulic mulches, <br />and installation of erosion control blankets. Sediment control may include properly sized detention <br />basins, dams, or filters to reduce entry of suspended sediment into the storm drain system and <br />watercourses and installation of construction entrances to prevent tracking of sediment onto <br />adjacent streets. Pollution prevention practices may include designated washout areas or facilities, <br />control of trash and recycled materials, covering of materials stored on-site, and proper location of <br />and maintenance of temporary sanitary facilities. Compliance with the City’s Municipal Code Section <br />9.14 would ensure that impacts related to erosion and drainage would be less than significant. This <br />comment is included in the administrative record and will be provided to the decision-makers for <br />review and consideration. The comment did not provide new, substantial evidence with respect to <br />the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required. <br />Response to T.VINSON 1-6 <br />As noted in Draft EIR Section 3.3, Biological Resources, page 3.3-2, average annual rainfall is <br />approximately 16 inches and stormwater runoff readily infiltrates the site’s soils; when field capacity <br />has been reached, gravitational water drains into the seasonal drainages and the creek on-site as <br />shallow groundwater or as surface sheet flow, which then flows into Devaney Creek. As stated in <br />Draft EIR Section 3.9, Hydrology and Water Quality page 3.9-20, the majority of the 130.98-acre site <br />would be left as undeveloped open space and existing drainage would not be modified outside of <br />the approximately 7.4 acres of proposed impervious surfaces. Additionally, as stated on Draft EIR <br />page 3.3-41, the proposed project would include the construction of an 18-inch outfall that will drain <br />into the west side of Devaney Creek and a 24-inch outfall that drains into the east side of Devaney <br />Creek near the vicinity of Dublin Canyon Road. The applicant will need to comply with all State and <br />federal regulations related to construction work that will impact aquatic habitats occurring on the