Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />14 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />xx Building windows shall be tinted with an anti-reflective material. <br /> <br />Facts in Support of Findings: The proposed project would result in the net development of 28 new <br />single-family residences with associated windows and reflective building materials on an <br />undeveloped site. Thus, upon full buildout the proposed project would inevitably increase the <br />amount of glare generated at the project site when compared to existing conditions. (Draft EIR, p. <br />3.1-15). As such, impacts on daytime glare during operations would be potentially significant. <br />However, the proposed project would be required to undergo standard design review process to <br />ensure compliance with applicable lighting and energy requirements to reduce these impacts. (Draft <br />EIR, p. 3.1-16). This includes those within the California Energy Code designed to minimize spillover <br />of light and glare onto adjacent land uses. To ensure compliance with these standards, Mitigation <br />Measure (MM) AES-4 would be implemented to ensure conformance with all applicable light and <br />glare requirements, including those from the California Energy Code, in order to reduce impacts on <br />daytime glare to less than significant. <br />The Lead Agency finds that MM AES-4 is feasible, is adopted, and will further reduce impacts related <br />to daytime glare impacts. Accordingly, the Lead Agency finds that, pursuant to Public Resources Code <br />Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or alterations have been <br />required in, or incorporated into, the proposed project that mitigate or avoid the potentially <br />significant impacts as identified in the EIR. Therefore, impacts associated with light and glare would <br />be less than significant with mitigation incorporated. <br />1.6.2 - Impact BIO-1: Special-status Species <br />Impact BIO-1: The proposed project would not have a substantial adverse effect, either directly or <br />through habitat modifications, on any species identified as a candidate, sensitive, or special-status <br />species in local or regional plans, policies, or regulations, or by the California Department of Fish and <br />Wildlife or United States Fish and Wildlife Service. <br />Findings: Less than significant impact with mitigation incorporated. (Draft EIR, p. 3.3-37). <br />Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1).) <br />Mitigation Measures <br />MM BIO-1a Compensation Measures for Congdon’s Tarplant <br />The project shall compensate for the loss of tarplant on the project development <br />area via the preservation of estimated individuals at a mean ratio of 8:1. However, <br />per the East Alameda County Conservation Strategy (EACCS), mitigation for <br />Congdon’s tarplant must also demonstrate habitat enhancement, not just <br />preservation; therefore, a Resource Management Plan (RMP) shall be prepared and <br />implemented, as described below by a qualified Biologist. At a minimum, the RMP <br />shall include the following: