Page 1 of 3 <br />Item #7 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />June 2, 2026 <br />Public Works - Engineering Division <br /> <br />TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY INTEGRA <br />CONSTRUCTION SERVICES, INC. FOR THE LIONS WAYSIDE AND DELUCCHI <br />PARK RENOVATIONS, CIP NO. 06716, AND APPROVE A BUDGET <br />AMENDMENT IN THE PARK DEVELOPMENT IMPACT FEE FUND <br /> <br />SUMMARY <br />The Lions Wayside and Delucchi Parks Renovations project, CIP No. 06716, included <br />construction of a new bandstand, plaza, concert viewing areas, trails, parking lot, lighting, lawn <br />renovations, furnishings, and landscaping and irrigation at the City’s two downtown parks on <br />First Street: Lions Wayside Park and Delucchi Park. Construction occurred from October 2024 <br />through June 2025, with additional parking lot improvements completed in November 2025. <br />The project is now complete to the satisfaction of the Director of Public Works at a total <br />construction cost of $1,911,631. <br /> <br />Staff recommends the City Council accept the project as complete, authorize the City Clerk to <br />file a Notice of Completion, and authorize the return of the remaining project balance of <br />$36,834 to the Park Development Impact Fee Fund (Fund 222). <br /> <br />RECOMMENDATION <br />1. Accept public improvements performed by Integra Construction Services, Inc. for the <br />Lions Wayside and Delucchi Parks Renovations project, CIP No. 06716, as complete. <br />2. Authorize the City Clerk to file a Notice of Completion. <br />3. Approve a budget amendment to reduce the project's remaining budget, $36,834, to $0 <br />in the Park Development Impact Fee Fund (Fund 222). <br /> <br /> <br />BACKGROUND <br />In 2006, the City Council prioritized the renovation of the two downtown parks, Lions Wayside <br />and Delucchi, and approved funding to create a master plan. The master plan was adopted in <br />2014. However, the City was unable to obtain approval from the California Department of Fish <br />and Wildlife, the U.S. Army Corps of Engineers, and the State Water Resources Control <br />Board. As a result, the City Council directed staff to focus on constructing park improvements <br />that could be completed within the available project budget. <br /> <br />Staff revised the project design and worked with Callander Associates Landscape Architecture, <br />Inc., to prepare construction drawings utilizing a total project budget of approximately $1.9 <br />million with bid alternates to ensure that the base bid for the project came in under budget. The <br />project was advertised for bid in summer 2024. <br /> <br />On September 3, 2024, the City Council awarded the construction contract for the Park <br />Page 298 of 617