My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 2:56:22 PM
Creation date
5/29/2026 2:52:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />adoption of the Draft 2025 UWMP and WSCP, included as Attachment 1. <br /> <br /> <br />DISCUSSION <br />The City’s water supply reliability is closely tied to Zone 7’s water supply reliability policy. Since <br />2023, Zone 7 has provided 100 percent of the City’s potable water supply and serves as the <br />Tri-Valley groundwater manager. As a result, Zone 7’s seasonal and climatic supply <br />constraints directly affect the City’s supply reliability and vulnerability to shortages. <br /> <br />The water quantity available to Zone 7 from its different supply sources varies annually <br />depending on hydrologic conditions. Accordingly, as part of Zone 7’s 2025 UWMP preparation, <br />Zone 7 reviewed historical data and developed projected yields for each water supply source <br />under three conditions: (1) normal water year, (2) single-dry year, and (3) a consecutive five- <br />year drought. This information, in turn, informed the City’s water supply reliability assessment. <br /> <br />The key outcome of the Draft 2025 UWMP and WSCP is that Zone 7 is expected to have <br />adequate supply reliability to meet the City’s current and projected demands through 2045 <br />under the majority of analyzed scenarios. The only scenario showing a small shortfall for <br />Pleasanton (10 percent) is a five-year drought beginning in 2045, specifically in the fifth <br />consecutive year of drought. This shortfall is considered manageable through conservation <br />measures consistent with the WSCP. To strengthen delivery reliability, Zone 7’s current <br />portfolio includes future water supply projects such as groundwater banking, water transfers, <br />Site Reservoir, and the Chain of Lakes Project, as well as exploratory planning for potable <br />reuse and desalination. <br /> <br />Each water shortage event is unique and requires a situational assessment, and the WSCP <br />details the City’s strategic approach. Accordingly, during potential future water shortage <br />events, staff will assess supply in close coordination with Zone 7, as outlined in the WSCP, <br />and, when applicable, bring forward recommendations to the City Council based on the <br />assessment findings. <br /> <br />Update Following Public Draft Release <br />Following the release of the Public Draft 2025 UWMP and WSCP, the State Division of <br />Drinking Water (DDW) adjusted the City’s water loss standard from the original version shown <br />in Table 4-3 from a “Real Water Loss Standard” of 18.8 gallons per service connection per day <br />(gpscpd) shown, to 28.5 gpscpd. The final 2025 UWMP and WSCP will reflect the updated <br />value in Table 4-3 and include minor associated language adjustments to Section 4.4 to reflect <br />this updated information. <br /> <br />This DDW-approved adjustment to the City’s original real water loss standard followed an <br />economic water loss model analysis provided by City staff, demonstrating that a higher <br />standard was justified. The DDW-approved adjusted value will improve future compliance with <br />the water loss standard and the Urban Water Use Objective requirement under the Making <br />Water Conservation a Way of Life regulations. <br /> <br />EQUITY AND SUSTAINABILITY <br />Adoption of the draft 2025 UWMP and WSCP supports long-term water supply reliability and is <br />consistent with Strategy WR-1 of the City’s Climate Action Plan 2.0. <br />Page 381 of 617
The URL can be used to link to this page
Your browser does not support the video tag.