Laserfiche WebLink
Ordinance No. 2306 <br />Page 30 of 35 <br />Page 30 of 35 <br /> <br />All plans shall be prepared by a licensed landscape architect and shall provide the <br />species, location, size, quantities, and spacing of all plants. Minimum plant sizes are 1- <br />gallon containers for ground cover, 5-gallon containers for shrubs, and 15-gallon <br />containers for trees. Plant species shall be of a drought-tolerant nature and the irrigation <br />design shall utilize low-volume drip, bubbler, or other water conserving irrigation <br />systems to the maximum extent possible. The drawings shall be subject to the review <br />and approval of the City Landscape Architect prior to building permit issuance. <br /> <br />102.101. WATER EFFICIENT LANDSCAPE ORDINANCE (WELO): The project shall <br />comply with the City of Pleasanton’s Water Efficient Landscape Ordinance (WELO) and <br />Bay Friendly Basics Landscape Checklist. The project developer shall submit a <br />Landscape Documentation Package in PDF format to the Landscape Architecture <br />Division, which shall be subject to review and approval by the City Landscape Architect <br />prior to building permit issuance. The Landscape Documentation Package shall <br />include: <br /> <br />a. Project Information; <br /> <br />b. Water Efficient Landscape Worksheet; <br /> <br />c. Soil management report; <br /> <br />d. Landscape design plan; <br /> <br />e. Irrigation design plan; and <br /> <br />f. Grading design plan. <br />103.102. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to <br />final inspection by the Building and Safety Division, the project developer’s landscape <br />architect shall submit a Certificate of Completion Package in PDF format to the <br />Landscape Architecture Division for review and approval. The Certificate of Completion <br />Package shall include: <br /> <br />a. Project information sheet; <br /> <br />b. Certificate of installation according to the landscape documentation package; <br /> <br />c. Irrigation scheduling; <br /> <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br /> <br />e. Landscape irrigation audit report; and <br /> <br />f. Soil management report (if not previously submitted). <br />Page 53 of 617